15 mm~
!!
1
2
3
Pa
g.
4
- M
an
ua
l c
od
e:
3
1
9
T6
9
E
N
31
9T6
9
E
N
ve
r.
2
0
7/
2
01
5 © C
A
M
E S
.p.
A
. - T
he d
ata a
nd i
nf
or
m
ati
on r
ep
orte
d i
n th
is
in
sta
lla
tio
n m
an
ua
l a
re s
us
ce
pti
bl
e to c
ha
ng
e at a
ny ti
m
e
an
d w
ith
ou
t o
bl
ig
ati
on
o
n C
A
M
E S
.p.
A
. to n
otify u
se
rs.
4.2 Tools and materials
Ensure you have all the tools and materials necessary for carrying out the installation according to current safety standards.
See the following examples.
4 .1 Preliminary checks
4 Installation
Installation must be carried out by qualifi ed and expert personnel, fully respecting the current standards.
Before attempting installation, you must:
•
Ensure that the control board fi xing point is in an area protected from bumps and that the anchoring surfaces
are secure and solid.
•
Make provision for a suitable omnipolar disconnection device, with power supply cut-off, leaving more than 3 mm between
the contacts
Assemble the spring-type hinges,
insert the hinges into the housing (on the) left or
right as preferred) and secure with
the screws and washers supplied
they flow for rotating
Snap the cover over the hinges, then close and secure it
using the screws supplied
3.4 Assembling hinge housing
1
2
3
Содержание ZCX10
Страница 17: ...230V CONTROL BOARD OR C BXE C BXEK GEARMOTORS English EN Installation Manual ZCX10 319T69EN...
Страница 49: ...230 C BXE C BXEK ZCX10 RU 319T69RU...
Страница 52: ...15 mm 1 2 3 4 319T69RU 319T69RU 2 07 2015 CAME S p A CAME cancelli automatici S p A 4 2 4 1 4 3 3 3 1 2 3...
Страница 57: ...9 319T69RU 319T69RU 2 07 2015 CAME S p A CAME cancelli automatici S p A 5 3 ENTER 1...
Страница 58: ...10 10 319T69RU 319T69RU 2 07 2015 CAME S p A CAME cancelli automatici S p A 5 4 10 120 1 120 1 5 1 120 2 7 2 7...
Страница 60: ...12 12 319T69RU 319T69RU 2 07 2015 CAME S p A CAME cancelli automatici S p A 5 4 1 16...