!!
p.
44
- M
an
ua
l c
od
e:
FA
0
0
6
9
2
-E
N
-E
N
v
.
2
2
08
/2
01
6
© C
A
M
E S
.p.
A
. -
Th
e d
ata a
nd i
nfo
rm
ati
on i
n t
hi
s m
an
ua
l m
ay b
e c
ha
ng
ed at a
ny time a
nd wit
ho
ut n
oti
ce
.
Before beginning to install, the following is necessary:
Make sure that the point where the electrical panel is anchored is free from any impacts, and that the surface is solid and that
proper tools and materials are used (i.e. screws, wall plugs, etc.).
Set up a suitable omnipolar cut-off device, with distances greater than 3 mm between contacts, with sectioned power source
•
Check that any connections inside the container (made for continuity purposes of the protective circuit) are fitted with extra
insulation compared to other internal conductive parts.
• Set up proper conduits and electric cable raceways, making sure these are protected from any mechanical damage.
1) Secure the base of the panel in a safe area; we suggest
using Philips rounded-head screws with max 6 mm
diameters.
2) perforate the marked holes and insert the cable glands
with corrugated tubes for the electrical cables to run
through.
N.B.: the diameter of the marked holes is 20mm.
4) insert the hinge into the housing (either left or
right) and secure them using the issued screws and
washers.
3) Assemble the pressure hinge.
Anchoring and installung the box
Installation
Preliminary checks
you need to slide the
hinges to rotate them