background image

¿MM

¿MM

            

6

            

A

ll t

h

e d

at

a a

n

d i

n

fo

rm

at

io

n c

o

n

ta

in

ed h

er

ei

n i

s c

o

n

si

d

er

ed s

u

b

je

ct to c

h

an

g

e a

t a

n

y t

im

e a

n

d a

t o

u

r d

is

cr

et

io

n

ENGLISH

During the initial phase of installation, the feet should protrude by 5-10 mm. in order to allow for alignment, anchorage of the 
rack and further adjustments.
Perfect alignment with the guide rail is made possible by the (paten-ted) built-in regulation system, which consists of: 
- slots for horizontal adjustment;
- threaded steel feet for vertical adjustment and levelling;
- plates and bolts for anchorage to the base.

5.5 Unit installation

5.6 Attaching the rack/limit

Attach the rack to the gate as described below:
- Release the gearmotor (parag. 5.8);
- position the rack on the pinion of the gearmotor and slide the gate manually in order to attach the rack along its entire length;
- when the rack is attached to the gate, adjust the feet using a screwdriver until the play between the pinion and the rack is 

correct (1-2 mm.).

N.B.: This position ensures that the weight of the gate does not rest on the gearmotor.
- If the rack is already attached, proceed directly to the adju-stment of the rack/pinion coupling. 
- when the necessary adjustment have been completed, fasten the unit in position by tightening the two anchor bolts.

Horizontal adjustment 

and unit anchorage

Vertical adjustment 

and unit leveling

Cable entrances

Rack-to-pinion coupling 
with 1÷2 mm clearance

Содержание PRATICO SYSTEM BX Series

Страница 1: ...AUTOMATION WITH PRATICO SYSTEM FOR SLIDING GATES INSTALLATION MANUAL BX SERIES BX P ...

Страница 2: ...tandards in force Guaranteed 24 months if not tampered with The case consists partly of cast aluminium inside of which operates the non reversible electromechanical gearmotor and partly of a covering in ABS plastic inside of which is an electronic card the transformer and the emergency battery holder The BX P ratiomotor may be supplied with complementary accessories such as 001 R001 Lock cylinder ...

Страница 3: ...sic control board 5 Electric board front cover 6 Release door 7 Base plate 8 Securing screws 9 Plates for securing screws 10 Nuts ACCESSORIES 1 R001 Cylinder lock with DIN keys 2 BSF Braking device 3 BRC Cable winding device 4 B4353 Chain transmission device 5 CCT Simple 1 2 chain 6 CGIU 1 2 chain joint 7 CGZ Galvanized steel 22 x 22 module 4 rack 8 CGZF PA 6 nylon 20 x 30 module 4 rack with holes...

Страница 4: ...ns in force 5 Installation 5 2 Tools and materials Make sure all tools and materials necessary are within reach to install the edge in maximum safety according to regulations in force The following figure illustrates the minimum equipment for the installer N B An evaluation of the size of the cables with lengths other than the data in the table must be made based on the effective absorption of the...

Страница 5: ... to base anchorage Install the screws in the anchor plate and fasten them with a nut then bend the preformed clamps downwards Construct a cement foundation that is large enough to accomodate the gear motor it is a good idea to protrude 50 mm from the ground When pouring the foundation embed the gear motor anchor plate and the relative clamps in the cement The anchor bolts should be embedded in the...

Страница 6: ...it Attach the rack to the gate as described below Release the gearmotor parag 5 8 position the rack on the pinion of the gearmotor and slide the gate manually in order to attach the rack along its entire length when the rack is attached to the gate adjust the feet using a screwdriver until the play between the pinion and the rack is correct 1 2 mm N B This position ensures that the weight of the g...

Страница 7: ...tions determine the limits of gate travel on the rack Note do not allow the gate to strike the mechanical stops in the open or closed positions 5 8 Manual release of the gearmotor To open the access door insert the key push down and rotate clockwise Now release the gear motor by rotating the knob in the direction shown BLOCK RELEASE ATTENTION the opening of the unblock panel arrests the motor ...

Страница 8: ...a 5A fuse on the main power line Control systems are powered by low voltage and protected with by a 1A fuse The total power consumption of 24V accessories must not exceed 40 W Photoelectric cells may be connected and set for reopening during closure partial stop total stop and detection of an obstacle with the motor turned off Note if a usually closed safety contact 2 C1 2 C3 or 1 2 is opened it i...

Страница 9: ...opens Connection limit switch closes Antenna connection Condenser U W V 230 V a c motor M EB EB Output supplied for electric lock N B Maintain polarity when connecting photoelectric cells DIR 48 48 48 28 5 6 7 0 11 FC 24V 3W max gate opened signal lamp 11 FA 24V 3W max gate closed signal lamp cycle lamp max 60W to position the dips 1 and 6 in ON B1 B2 Contact output N O Resistive load 5A 24V d c 2...

Страница 10: ...tified by the black wire connected to the CT terminal to one of four positions 1 min 4 max 6 4 Gearmotor end stop connection Gearmotor end stop assembly already connected for installation on the left hand side seen from inside FA FC NC NC COM F U W M V FA FC NC NC COM F U W M V For right hand installation reverse FA FC of the end stops on the terminal board reverse the U V phases of the motor on t...

Страница 11: ... and or open stop close stop button with radio frequency card inserted 2 OFF Radio function command and or open close inversion button with radio frequency card inserted 3 ON Radio function command only open with radio frequency card inserted 4 ON Maintained Action operations Operation of the gate by keeping the pushbutton pressed for opening on 2 3 button for closing on 2 4 excluding the radio tr...

Страница 12: ...5 page 8 when the power is off because the motherboard only recognises it when it is powered 1 On AM transmitters operating at 433 92 MHz TOP and TAM series position the jumper connection on circuit card AF43S as shown on the sheet Frequency MHz Radiofrequecy board Transmitter FM 26 995 AF130 TFM FM 30 900 AF150 TFM AM 433 92 AF43S AF43SM TAM TOP AM 433 92 AF43SR ATOMO AM 40 685 AF40 TOUCH 7 2 Pro...

Страница 13: ...158 CAME 7 3 Memorizing the code on the command board 02 02 CH1 AF1 T1 1 Keep the CH1 key pressed on the base card ref point 9 page 8 the signal LED will flash 2 Press a transmitter key to send the code the LED will remain lighted to signal memorization CH1 Channel for direct commands to a function of the ratiomotor control unit open only open close invert direction commands or the open stop close...

Страница 14: ... 1 Preparation of the radio board AF2 8 Installation procedure for the remote control for automatically releasing the motor pratico system Before installation read the procedures below preparation of the radio board paragraph 8 1 battery connection and memorization of the code on the control board paragraph 8 2 The pratico system automatically releases the automation through the radio transmitter ...

Страница 15: ... the code on the control board 12V 1 2 Ah emergency batteries Battery bracket Led 230V power supply signal Electric lock Transformer Terminal 02 02 2 Keep the key ref point 19 page 8 on the basic board depressed The signalling LED ref point 18 page 8 flashes intermittent LED 3 Press a key the same one memorized for ope ning the gate on the transmitter to send the code The LED will remain lighted t...

Страница 16: ...figure Note the partial opening key 2 3P should be connected to the control board terminal board of the relevant motor motor A for opening toward the left B for opening toward the right 5 Insert the AF1 radio card on ratiomo tor A s control board and proceed with the installation of the remote control use CH2 channel command for two paired motors see chapter 7 pg 12 After saving the code on CH2 co...

Страница 17: ...arbage collection bins and can be recycled by disposing of in specific re cyclable material collection bins and disposal in authorized centres Other components electrical boards remote control batteries etc however may contain polluting substances They should therefore be removed and given to qualified service companies for proper disposal Prior to disposal it is always advisable to check specific...

Страница 18: ...Cod 119BT85 ver 1 0 03 06 CAME CANCELLI AUTOMATICI CAME UNITED KINGDOM LTD UNIT 3 ORCHARD BUSINESS PARK TOWN STREET SANDIACRE NOTTINGHAM NG10 5BP U K Tel 0044 115 9210430 Fax 0044 115 9210431 ...

Отзывы: