E
A
M1 N1 ENC1
M2 N2 ENC2
M
M
M2 N2 ENC2
M
p.
14
- M
an
u
al
FA
0
1
0
8
6
-E
N
- 0
2
/2
0
18 - © C
A
M
E S
.p.
A
. - "
Tr
an
sl
ate
d o
rig
in
al
in
str
u
cti
on
s"
Opening
(°)
A
(mm)
B
(mm)
E
(mm)
90
130
130
740
CONNECTION FOR OPENING OUTWARDS
⚠
Establish the quotas
A
and
B
.
Cut and fasten post bracket
by supplementing it with an additional bracket
b
(not issued).
Open the gate (max 90°), establish the quota
E
and establish the gate bracket fastening point. Fasten the bracket.
Gearmotor with encoder
(M1)
24 V DC, delayed when
opening
.
Gearmotor with encoder
(M2)
24 V DC, delayed when
closing
.
Gearmotor with encoder
(M2)
24 V DC
CONNECTING ONE GEARMOTOR
CONNECTING TWO GEARMOTORS