background image

405

330

16

0

60

67

Pa

g.

 

3

  - M

an

u

al

 c

od

e: 

11

9

A

U

3

5

11

9

A

U

3

5

 ve

r.

 

1.

0

1.

0

  0

8

/2

0

10  © C

A

M

E c

an

ce

lli

 auto

m

ati

ci

 s.p.a. - T

h

e d

ata a

n

d i

nf

or

m

ati

on r

ep

orte

d i

n th

is

 in

sta

lla

tio

n m

an

u

al

 a

re s

u

sc

ep

tib

le to

 c

h

an

g

e at a

ny ti

m

e a

n

d w

ith

ou

t o

b

lig

ati

on

 o

n C

A

M

E c

an

ce

lli

 auto

m

ati

ci

 s.p.a. to n

otify u

se

rs.

ENGLISH

4.3 Dimensions

Make sure you have all the tools and materials you will need for the installation at hand to work in  total safety and compliance with the 
current standards and regulations. The following figure illustrates the minimum equipment needed by the installer.

5.2 Tools and materials

5 Installation

 Before installing, do the following:

• Make sure you have a suitable omnipolar cut-off device with contacts more than 3 mm apart, and independent (sectioned off) power 

supply;

• Make sure you have suitable tubing and conduits for the electrical cables to pass through and be protected against mechanical 

damage;

• Fit tubing to drain away any water leaks which may cause oxidation;
• 

 Make sure that any connections inside the case (that provide continuance to the protective circuit) be fitted with extra insulation as 

compared to the other conductive parts inside;

• Make sure the structure of the gate is sturdy, the hinges work and that there is no friction between moving and non-moving parts;
• Make sure there is a mechanical stop for opening and closing.

             Installation must be carried out by expert qualified personnel and in full compliance with current regulations.

5.1 Preliminary checks

Содержание FROG A24

Страница 1: ...FROG SERIES INSTALLATION MANUAL FROG A24 FROG A24E IN GROUND OPERATOR FOR SWING GATES English EN ...

Страница 2: ...ompletely visible If missing ap ply a permanent label that shows the position of the release mechanism Before delivering to the client verify that the system is EN 12453 impact test standard compliant Make sure that the operator has been properly adjusted and that the safety and protection devices as well as the manual release are working properly Where necessary and in plain sight apply the Warni...

Страница 3: ...THIS PAGE LEFT INTENTIONALLY BLANK THIS PAGE LEFT INTENTIONALLY BLANK ...

Страница 4: ...IED INSTALLERS 2 2 Limits to use This product is engineered and manufactured by CAME CANCELLI AUTOMATICI S p A and complies with current safety regulations The operator is made up of a foundation box a release assembly a gearmotor and a transmission arm Zinc plated press forged fondation box for underground installation On the inside is the release assembly with a customised manual release key and...

Страница 5: ... sure you have a suitable omnipolar cut off device with contacts more than 3 mm apart and independent sectioned off power supply Make sure you have suitable tubing and conduits for the electrical cables to pass through and be protected against mechanical damage Fit tubing to drain away any water leaks which may cause oxidation Make sure that any connections inside the case that provide continuance...

Страница 6: ... connecting products that are not described in this manual please refer to the instructions that come with said products 5 3 Cable list and minimum thickness Connections Type of cable Length of cable 1 10 m Leng cable 10 20 m Leng cable 20 30 m Control panel power supply 230V FROR CEI 20 22 CEI EN 50267 2 1 3G 1 5 mm2 3G 2 5 mm2 3G 4 mm2 Motor power supply 24V 2 x 1 mm2 2 x 1 5 mm2 2 x 2 5 mm2 Fla...

Страница 7: ...ement Fig 3 part 3 making sure it is perfectly levelled and that the upper edge is 3mm above ground level Fig 3 part 4 Plan for the route of the electrical cables according to the command and safety instructions using the apposite hole on the box Fig 3 part 5 Grease the rotation pins of the foundation box and the gate attachment lever the hinge and pin lever must be aligned Position the gate leaf ...

Страница 8: ...ontrol panels 6 Connecting to the control panel brown brown blue Power supply Opening deceleration Closing deceleration White Brown Green Green Brown White 5 7 Manual release In emergencies i e power outages the release mechanisms allow the gate to hook back up when closing You may choose among three different release models model A4366 with customised key Fig 5 A model A4365 with tri lobed key an...

Страница 9: ...fy users ENGLISH brown blue brown 7 1 Adjusting the brake microswitches Using the motor make so that the gate leaf is max 500mm from being fully opened At this point do a first adjustment of the endstop microswitches positioning them close to the magnet Consider that this type of endstop reads the magnetic field You may have to repeat the procedure to increase the precision of the adjustment fig 6 7 ...

Страница 10: ...rroneous or negligent uses Avoid working close to the hinges or other moving mechanical parts Stay out of the opening closing arc when operator is in motion Do not exercise force against the motion of the operator as this could result in potentially dangerous situations Do not allow children to play or loiter within the opening closing arc of the operator Keep remote controls and any other command...

Страница 11: ...forming any maintenance procedures cut off the main power to prevent possible accidents due to gate movement To clean the photocells use a water dampened cloth Do not use solvents or other chemical products which may ruin the devices In the event of any strange vibrations or squeaking lubricate the joints with grease as shown in the diagram Make sure there are no plants within the photocell s beam...

Страница 12: ...me Date of job Technician s segnature Requester s segnature Job performed _______________________________________________________________________________________ __________________________________________________________________________________________________ Installer s stamp Operator name Date of job Technician s segnature Requester s segnature Job performed ____________________________________...

Страница 13: ...e Job performed _______________________________________________________________________________________ __________________________________________________________________________________________________ In its premises CAME cancelli automatici s p a implements an Environmental Management System certified in compliance with the UNI EN ISO 14001 standard to ensure environmental protection Please con...

Страница 14: ...tion Solutions Pvt Ltd Automation Solutions Pvt Ltd A 10 Green Park 110016 New Delhi New Delhi 91 11 64640255 256 91 2678 3510 CAME Americas Automation Llc CAME Americas Automation Llc U S A 11345 NW 122nd St Medley Medley FL 33178 1 305 433 3307 1 305 396 3331 ASIA CAME Asia Pacific CAME Asia Pacific 60 Alexandra Terrace 09 09 Block C The ComTech 118 502 Singapore Singapore 65 6275 8426 65 6275 5...

Отзывы: