CAME BKS22AGE Скачать руководство пользователя страница 7

300

500

450

p.

 

7

 - M

anu

al 

FA

0

1

2

9

2-

E

N

 - 1

2

/2

0

18 - © C

A

M

E S

.p

.A

. - T

he co

nt

en

ts of t

his manu

al ma

y c

hange

, a

t an

y t

ime

, and wit

h

ou

t n

ot

ice

. - O

riginal inst

ru

ct

io

ns

LAYING THE CORRUGATED TUBES

Dig a hole for the foundation frame.
Set up the corrugated tubes needed for the wiring coming out of the junction pit. 
For connecting the gearmotor we suggest using a Ø 40 mm corrugated tube, whereas for the accessories we suggest Ø 25 mm tubes.

 The number of tubes depends on the type of system and the accessories you are going to fi t.

GENERAL INSTALLATION INDICATIONS

 Only skilled, qualified staff must install this product.

PRELIMINARY CHECKS

⚠ 

Before beginning the installation, do the following:

• check that the upper slide-guides are friction-free;
• check that the gate is stable and that the casters are in good working order and lubricated;
• check that the ground rails are well-fastened, entirely on the surface and are smooth and level so as not to obstruct the gate's movement;
• make sure you have fitted opening and closing mechanical gate stops;
• make sure that the point where theoperator is fastened is protected from any impacts and that the surface is solid enough;
• set up suitable tubes and conduits for the electric cables to pass through, making sure they are protected from any mechanical damage.

CABLE TYPES AND MINIMUM THICKNESSES

Connection

cable length

< 20 m

20 < 30 m

Input voltage for 230 V AC control board
(1P+N+PE)

3G x 1.5 mm

2

3G x 2.5 mm

2

Flashing light

2 x 0.5 mm

2

Command and control devices

2 x 0.5 mm

2

TX Photocells

2 x 0.5 mm

2

RX photocells

4 x 0.5 mm

2

 

When operating at 230 V and outdoors, use H05RN-F-type cables that are 60245 IEC 57 (IEC) compliant; whereas indoors, use H05VV-F-

type cables that are 60227 IEC 53 (IEC) compliant. For power supplies up to 48 V, you can use FROR 20-22 II-type cables that comply with EN 
50267-2-1 (CEI).

 

To connect the antenna, use the RG58 (we suggest up to 5 m).

 For combined connection and CRP, use a UTP CAT5-type cable (up to 1,000 m long).

 

If cable lengths differ from those specified in the table, establish the cable sections depending on the actual power draw of the connected 

devices and according to the provisions of regulation CEI EN 60204-1.

 

For multiple, sequential loads along the same line, the dimensions on the table need to be recalculated according to the actual power draw 

and distances. For connecting products that are not contemplated in this manual, see the literature accompanying said products

INSTALLING

The following illustrations are mere examples in that the space for fastening the operator and accessories varies depending on the installation area. 

It is up to the fi tter, therefore, to choose the most suitable solution.

 

The drawing show an operator fitted on the left. 

Содержание BKS22AGE

Страница 1: ...Sliding gate operator BK series BKS22AGE BKS22ALE INSTALLATION MANUAL EN English FA01292 EN...

Страница 2: ...2 3 1 1 2 3 1...

Страница 3: ...sure that opening and closing limiters are tted Make sure the operator is installed onto a sturdy surface that is protected from any collisions Make sure that mechanical stops are already installed If...

Страница 4: ...ng a control board with graphic display for programming functions plus a device for movement and obstruction detecting for sliding gates up to 2 200 kg in weight and 20 m in length INTENDED USE The op...

Страница 5: ...y time and without notice Original instructions Number of cycles Length of gate m Number of cycles Length of gate m Consecutive cycles graph Cycles hour graph DUTY CYCLES Datum BKS22AGE BKS22ALE Cycle...

Страница 6: ...elector 5 Antenna 6 Flashing light 7 Photocells 8 Small post 9 Mechanical gate stop 10 Sensitive safety edge 11 Junction pit DESCRIPTION OF PARTS 1 Cover 2 Front cover 3 Gear motor 4 Fan 5 Condenser 6...

Страница 7: ...y mechanical damage CABLE TYPES AND MINIMUM THICKNESSES Connection cable length 20 m 20 30 m Input voltage for 230 V AC control board 1P N PE 3G x 1 5 mm 2 3G x 2 5 mm 2 Flashing light 2 x 0 5 mm 2 Co...

Страница 8: ...bolts which are entirely above surface Wait at least 24 hrs for the concrete to solidify Fit the bolts into the anchoring plate and tighten them using the nuts Remove the pre shaped clamps using a scr...

Страница 9: ...s manual may change at any time and without notice Original instructions Remove the foundation frame and fill the hole with earth around the concrete block Remove the nuts from the bolts Fit the elect...

Страница 10: ...nd the operator casing Place the operator on top of the anchoring plate Caution The electric cables must pass under the gearmotor casing and must not touch any parts that may overheat during use such...

Страница 11: ...djustment and the holes horizontal adjustment This prevents the gate s weight from bearing down on the operator FASTENING THE RACK If the rack is already set up the next step should be to adjust the r...

Страница 12: ...ch tab into the rack until the micro switch is activated spring and fasten it using the grub screws ESTABLISHING THE LIMIT SWITCH POINTS For opening open the gate t the opening limit switch tab onto t...

Страница 13: ...ctor for the R700 R800 R900 card 15 Programming buttons 16 Memory roll card slot 17 Display 18 Power supply on warning LED 19 Terminals for combined or CRP connection 20 Terminals for the RGP1 module...

Страница 14: ...HITE Condenser 120 230V AC gear motor with Encoder FACTORY WIRING Cable glands of the control board brace ELECTRICAL CONNECTIONS Connect all wires and cables in compliance with the law Before connecti...

Страница 15: ...ructions Flashing light connection output contact rated at 24 V AC 25 W max SIGNALING DEVICES Gate state warning output contact rated for 24 V AC 3 W max See function F10 Additional light connection o...

Страница 16: ...rol device NO contact Warning in MAINTAINED ACTION mode the control device must be connected to 2 4 PARTIAL OPENING function from control device NO contact OPEN CLOSE INVERT step by step function from...

Страница 17: ...gate is fully open again C2 closing during opening When the gate is opening opening the contact triggers the inversion of movement until the gate is completely closed C3 partial stop Stopping of the g...

Страница 18: ...perator and this error will show up on the display as E17 Fit the RSE card WARNING For the system to work properly before fitting the control board you MUST CUT OFF THE POWER MAINS and remove any emer...

Страница 19: ...C8 r7 r8 F3 Input 2 CY NC Can associate C1 reopening during closing by photocells C2 reclosing during opening by photocells C3 partial stop C4 obstruction wait C7 reopening during closing by sensitive...

Страница 20: ...180 seconds F20 Automatic closing time after partial opening The wait before the automatic closing starts after a partial opening command for a time of between 1 s and 180 s The automatic closing doe...

Страница 21: ...ted with a RIO CONN card OFF default P0 P0 P7 P7 P8 P8 F66 Wireless input RIO EDGE T2 RIO EDGE wireless safety device associated to a function of choice among those available P0 stop gate and exclude...

Страница 22: ...ns F54 Opening direction F1 Total Stop and A3 Gate travel calibration see the GATE TRAVEL CALIBRATION paragraph Once the programming is done verify that the operator and all the accessories are workin...

Страница 23: ...TER to confirm Select a command to associate to the user The commands are 1 step step open close 2 sequential open stop close stop 3 only open 4 partial opening pedestrian Press ENTER to confirm a num...

Страница 24: ...wireless system configuration ERROR MESSAGES The error messages appear on the display SAVING AND UPLOADING ALL DATA USERS AND CONFIGURATION WITH THE MEMORY ROLL Procedure for memorizing all of the sys...

Страница 25: ...command on the MASTER panel Programming Start by performing the following settings only on the MASTER control panel select 1 paired mode from the F49 function and press ENTER to con rm select the ope...

Страница 26: ...oard plastic and so on should be disposed of as solid household waste and simply separated from other waste for recycling Always make sure you comply with local laws before dismantling and disposing o...

Страница 27: ...p 27 Manual FA01292 EN 12 2018 CAME S p A The contents of this manual may change at any time and without notice Original instructions...

Страница 28: ...iri Della Libert 15 31030 Dosson di Casier Treviso Italy tel 39 0422 4940 fax 39 0422 4941 Manual FA01292 EN 12 2018 CAME S p A The contents of this manual may change at any time and without notice Or...

Отзывы: