Chapter 4: Preparing for installation
187
Chap t er 4 : Prep aring f or inst allat ion
This chapter describes how to stage and test the hardware for a 450 Platform network. This chapter is
arranged as follows:
l
Safety on page "Safety" below: Describes the precautions to be observed and checks to be
performed before proceeding with the installation
l
Preparing for installation on page "Preparing for installation" on page 189: Describes the pre-
configuration procedure before proceeding with installation.
l
Testing system components on page "Testing system components" on page 190: Describes the
procedures for unpacking and performing and initial staging of the 450 Platform Family ODU.
l
Configuring Link for Test on page "Configuring Link for Test" on page 198: Describes the
procedures for testing the equipment’s radio links.
Saf et y
Hazar d ous locat ions
Warning
When installing the PMP/PTP 450i ATEX/HAZLOC product variants in hazardous
locations, follow the instructions contained in the PMP/PTP 450i Series
Hazardous Location Guide (supplied in box with the products), in addition to the
instructions in this user guide.
Sit ing of ODU and sound ness of st r uct ur e
l
Ensure that the Outdoor Unit (ODU) and the structure to which it is mounted can withstand the
maximum wind speeds at a proposed site.
l
See windloading guidance in ODU wind loading on page 1.
W or king at heig ht s and near p ow er lines
l
Exercise extreme care when working at heights.
l
Observe national ‘working at heights’ regulations. Use trained competent staff.
l
Exercise extreme care when working near power lines.
Pow er sup p ly and p ow er saf et y
l
Always use a Cambium specified 450 Platform Family power supply unit (PSU) to power the ODU.
Failure to use a Cambium supplied PoE could result in equipment damage and may cause a safety
hazard.
l
Ensure the equipment is not powered during installation.
Содержание PMP 450 Series
Страница 92: ...Chapter 2 System hardware 92 Figure 29 MicroPoP Omni antenna implementation pattern Vertical...
Страница 134: ...Chapter 3 System planning 134 Figure 51 Mast or tower installation...
Страница 135: ...Chapter 3 System planning 135 Figure 52 Wall installation...
Страница 136: ...Chapter 3 System planning 136 Figure 53 Roof installation...
Страница 137: ...Chapter 3 System planning 137 Figure 54 GPS receiver wall installation...
Страница 158: ...Chapter 3 System planning 158 Figure 61 cnMedusa Antenna...
Страница 258: ...Chapter 5 Installation 258 Figure 123 Yagi antenna alignment horizontally Figure 124 Yagi antenna alignment upward tilt...