1. Benötigtes Werkzeug
• Ready mixed concrete / screed mortar
• Water
• Folding ruler
• Spirit level
• 5.5 mm hexagon
• Water pump pliers
• Spade
• Angle grinder & safety glasses
We recommend a hole size
of (W/D/H) 30 cm x 30 cm
x 60 cm. Concrete requires
approx. 55 - 60 L or
2x 40 kg bag per hole.
Both sides
attach
After the concrete
foundations have
set, the mesh and
spacers can be
mounted. Please
place the M8 fence
construction screw
straight and turn it
hand-tight.
Please refer to the table
on the following page for
the required number of
spacers.
3. Set posts
6. Installing the spacers
ATTENTION: Please distribute evenly.
4. Fence mounting
both sides
2480mm
50 cm
60 cm
MONTAGEANLEITUNG
BPS PFOSTENTYP C
ASSEMBLY
INSTRUCTIONS
Camas gabion post type 4
1/2
2. Foundations
Dimension between the
Posts = clear width
Watering
With a gradient of
more than 10% it is
recommended to
divide the grids*.
*Additional posts are
required here!
5. Setting with slope
Perpend
icular!