background image

1. Benötigtes Werkzeug

•  Ready mixed concrete / screed mortar
•  Water
•  Folding ruler
•  Spirit level
•  5.5 mm hexagon
•  Water pump pliers
•  Spade
•  Angle grinder & safety glasses

We recommend a hole size 
of (W/D/H) 30 cm x 30 cm 
x 60 cm. Concrete requires 
approx. 55 - 60 L or  
2x 40 kg bag per hole.

Both sides  
attach

After the concrete 

foundations have 

set, the mesh and 

spacers can be 

mounted. Please 

place the M8 fence 

construction screw 

straight and turn it 

hand-tight.

Please refer to the table 
on the following page for 
the required number of 
spacers.

3. Set posts

6. Installing the spacers

ATTENTION: Please distribute evenly.

4. Fence mounting 

  both sides

2480mm

50 cm

60 cm

MONTAGEANLEITUNG

BPS PFOSTENTYP C

ASSEMBLY

 

INSTRUCTIONS

Camas gabion post type 4

1/2

2. Foundations

Dimension between the 
Posts = clear width

Watering

With a gradient of 
more than 10% it is 
recommended to 
divide the grids*.

*Additional posts are 

required here!

5. Setting with slope

Perpend

icular!

Отзывы: