background image

1 7 |

P a g e

deferral can be repeated up to three times. 

PLEASE NOTE:

 At any point after lamp expiration, 

the water may be unsafe for consumption and should not be consumed without another form 

of disinfection.

Lamp Replacement

After the lamp is expired, it must be replaced with the same part number as indicated on the 

Maintenance Parts screen or on the label on the unit.  With the system powered down, remove 

and discard the lamp key from the controller. The replacement lamp is packaged with a lamp 

key on the connector at the end of the lamp.  Remove the key from the lamp and place it in the 

controller.  Refer to 

Installation

, starting with step 11 (page 10) for instructions on installing the 

new lamp.

QR Codes

QR code

 (Quick Response code) is a matrix barcode first designed for the 

automotive industry. Calmag uses the QR code to store a link to a specific 

page on our website. Users with a camera phone equipped with the correct 

reader application can scan the image of the QR code and over a wireless 

network connect to a Calmag web page in the phone’s browser. Calmag’s QR 

webpage has information on how to purchase replacement components as 

well as a helpful video directory on system servicing (i.e. How to change a UV 

lamp or quartz sleeve). To access the QR code on the Calmag controller, press 

the control button until the QR code screen appears.

Содержание UV-CalUltra 12

Страница 1: ...Operation Installation Instructions CalUltra UV Standard Systems Model Rated Flow UV CalUltra 12 12 lpm UV CalUltra 22 22 lpm UV CalUltra 41 41 lpm UV CalUltra 79 79 lpm Remember don t guess ASK...

Страница 2: ...ply with a UV system gives you reassurance that your family will have access to safe drinking water throughout your entire home with no chance of microbiological contamination This is a chemical free...

Страница 3: ...artz Sleeve 11 Cleaning the UV Sensor 12 Operation 12 CalUltra Controllers 13 Power up Sequence 13 Operational Screens un monitored version 14 Lamp Countdown Sequence 15 Lamp Replacement 15 QR Codes 1...

Страница 4: ...Contact Calmag for service instructions if required 7 Do not use this system for any purpose other than what it was intended for Misuse of this system could potentially cause harm to the user or othe...

Страница 5: ...reated Hardness 120 ppm if hardness level is 120 ppm or slightly below the quartz sleeve must be cleaned periodically in order to ensure efficient UV penetration if above the water must be softened Ir...

Страница 6: ...03 CM 300016 Complete Assembly 310026 Teflon Plug 310040 O Ring 390007 Brass Nut GLAND NUT O RING SLEEVE SPRING QUARTZ SLEEVE CHAMBER UV LAMP 320006 310038 310039 LAMP KEY Either UV SLEEVE QS12 12 lp...

Страница 7: ...on you can simply fill a 10 litre bucket with water from the mains supply and tome how long it takes to fill up This can then be calculated to litres per minute and the the approriate Calmag UV unit s...

Страница 8: ...Step 2 The use of a by pass assembly is recommended as it will allow you to isolate the UV unit This will allow for easier access in case maintenance is required See Figure 3 Step 3 Use appropriate f...

Страница 9: ...onto the sleeve until it is butted up against the reactor Figure 4 Quartz Sleeve Installation Step 7 Hand tighten the provided gland nut over the quartz sleeve onto the threaded end of the reactor It...

Страница 10: ...cognized by the controller the controller power must be plugged in last Do not plug the controller power cord in before the last step ON PRE BUILT UNITS STEPS 11 14 HAVE BEEN PRE ASSEMBLED Step 11 Alw...

Страница 11: ...home or facility could be contaminated Use the following steps to fully disinfect the lines throughout the entire home or facility Step 1 Check for and remove any dead legs in the lines throughout th...

Страница 12: ...o flow back down Step 4 Remove the captive ground screw from the ground lug on the UV unit Step 5 Remove the lamp connector from the unit gland nut by pushing the lamp connector in and turning it turn...

Страница 13: ...eplace sensor following step 9 from the installation section of the manual Operation CalUltra systems come with a feature laden controller that incorporates both the lamp driver ballast and control fe...

Страница 14: ...Ultra controllers include an infinite expandability port located on the right side of the controller Simply plug in an optional UV sensor module into the expandability port of a CalUltra controller an...

Страница 15: ...e default screen shows the CalUltra Home Screen At any point during operation the user is able to scroll through the CalUltra Home Screen Lamp life remaining QR Code Contact Info and Maintenance Parts...

Страница 16: ...th red low uv screen Lamp Countdown Sequence The system counts down the number of days until a lamp change is required At thirty days remaining the LED or display screen will change to a yellow cautio...

Страница 17: ...place it in the controller Refer to Installation starting with step 11 page 10 for instructions on installing the new lamp QR Codes A QR code Quick Response code is a matrix barcode first designed fo...

Страница 18: ...ger sufficient for proper disinfection Replace the lamp with the part as indicated on the silver label on the unit or on the Maintenance parts screen Low UV Intensity Remove and clean the quartz sleev...

Страница 19: ...ystem and to each other Modules can be tested individually by plugging in one at a time and cycling power to the system Replace any module that is not detected when plugged directly into the controlle...

Страница 20: ...ife fan is powered independently using a compact modular power adapter that operates from 90 265V 47 63Hz Contact Calmag for details Temperature Relief Valve TRV On reaching a higher temperature the T...

Страница 21: ...e solenoid valve to the system On a non monitored system the solenoid will only close on a lamp failure error On a monitored system the solenoid is closed when the UV level drops below 50 Also note th...

Страница 22: ...UV SLEEVE QS79 Chamber Dimensions 6 4 x 36 4 cm 2 5 x 14 3 6 4 x 54 2 cm 2 5 x 21 3 6 4 x 89 5 cm 2 5 x 35 2 6 4 x 101 6 cm 3 5 x 36 4 Chamber Material 304 Stainless Steel A249 Pressure Rated Tubing...

Страница 23: ...cing at Calmag s discretion without charge F O B Calmag s factory or authorised service depot any product that Calmag manufactures Calmag will not be liable for any costs of removal installation trans...

Страница 24: ...d Return Number must be included if so instructed CALMAG YORKSHIRE LIMITED WILL NOT BE LIABLE FOR ANY INCIDENTAL OR CONSEQUENTIAL DAMAGES LOSSES OR EXPENSES ARISING FROM INSTALLATION USE OR ANY OTHER...

Страница 25: ...2 5 P a g e Other UV units available from Calmag in regards to commercial applications...

Страница 26: ...wer Watts 120 170 220 320 360 430 900 1340 Replacement Lamp UV BULB B132 UV BULB B416 UV BULB B662 UV BULB B416 X2 UV BULB B530 X2 UV BULB B662 X2 UV BULB B662 X4 UV BULB B662 X6 Replacement Sleeve UV...

Страница 27: ...2 7 P a g e...

Страница 28: ...ed Riverview Buildings Bradford Road Riddlesden Keighley West Yorkshire BD20 5JH Phone 01535 210320 Fax 01535 210321 E mail sales calmagltd com Web www calmagltd com Remember don t guess ASK PN 910273...

Отзывы: