Installation Manual
Snow & Ice Melting
Loading Dock
Skid Plates
CCM
M1
10
02
20
0 - 04-08-13
Страница 1: ...Installation Manual Snow Ice Melting Loading Dock Skid Plates C CM M1 10 02 20 0 04 08 13 ...
Страница 2: ...e drainage is provided for water runoff Tools Materials CalorIQue Heated Skid Plate See Free Estimate Worksheet CM1012 for ordering details Typical heated skid plate Your model may vary Standard Electrical Hand Tools Overcurrent Protection User installer supplied The circuit breaker used with this sistem must have an overcurrent rating of 30 amps and an integral GFCI rated for 30mA equipment prote...
Страница 3: ...rIQue Heated Skid Plate s Make sure that power is turned off at the distribution panel before installing this system Install control system according to the separate instructions Using an accurate ohm meter test each skid plate to ensure that it is within the limits shown on the specificatasdfasdfion sheet Installation Drill Holes to Accept Expansion Shields Using the skid plate as a template mark...
Страница 4: ...al Connections Connect Skid Plates to the Control System Following the manufacturer s instructions for the control con nect the skid plates to the control Supply Power to the Control Test the System Operation Turn on the system and ensure that it is drawing the correct amount of current The current draw for your system is listed on the order sheet that comes with the system Operation NOTE Do not o...