Drill 2 holes to accommodate the plate II. Screw and tighten
the plate II onto the wall with two screws and wall. plugs provided
Slide up the upper chimney and fix the upper chimney with plate
II with 2 screws ST4x8mm
Fix the lower chimney with the hood with 2 screws ST4x8mm
7