7.0 Regular planned maintenance
Operations to be carried out during a regular planned maintenance visit are as follows:
1.
Clean the evaporators. (This action may be required more
frequently than regular servicing).
2.
Check operation of fans and compressors.
3.
Check capacitor tolerances - where fitted.
4.
Check condition of all heat exchangers/evaporators.
5.
Check refrigeration system parameters.
6.
Check operation of control valves.
7.
Check for water leaks.
8.
Check driptrays and internal drain lines for blockages and
clear.
9.
Check operation of controls and calibrate if necessary.
10.
Check operation of interlocks in use.
11.
Final check of overall operation of unit
12.
Indicate on Service report any faults found or causes for
concern.
13.
Recommended servicing frequencies:
- Light to medium use:
one visit per year
- Heavy use:
two visits per year