background image

After all the mounting process is done, the unit needs to go through another thorough 

checking and testing before it’s open to use.

6.1 SETTING UP AND CHECKING

1. Dust and clean the whole fitness unit.

2. Check for cracks or open areas in the painted coating.

3. Check the dial on the pylon. Turn the dial clockwise or anticlockwise to see if the turning is

smooth.

4. Check the screws and bolts. All the screws and bolts should have been be tightened and

covered with caps unless the screws have a half round head.

5. Check the plastic pipe caps.

6. Check the plastic grips and pedals.

6.2 TESTING

1. Make sure all the screws and bolts have been tightened before testing.

2. Place both of your feet on the pedals and grip the handles.

3. Move the pedals up and down and check if the movement is sooth and consistent.

4. Turn the dial clockwise or anticlockwise and check if the workout difficulty can be adjust-

ed.

5. The stepper is ready to use when all the testing has finished and no defects have been

found.

6. Should there be any malfunction, contact your dealer.

Caloo Ltd

www.caloo.co.uk | [email protected]

INSTALLATION

Model No.: CV-606 Stepper

6. POST-MOUNTING

Содержание CV-606

Страница 1: ...TEPPER Variable Resistance Equipment INSTRUCTION MANUAL Caloo Ltd CALOO LTD Unit 9A Triangle Business Park Wendover Road Stoke Mandeville Buckinghamshire HP22 5BL www caloo co uk 01296 614448 info cal...

Страница 2: ...workout immediately and consult your physician 4 Maximum allowed weight of a user is 150 kg Maximum allowed number of user is one person Other user is prohibited to enter the training zone while the...

Страница 3: ...INSTALLATION Model No CV 606 Stepper Product Size 965 x 379 x 1437 mm Free Height of Fall 450 mm Net Weight 91 3 kg 1 DATA SHEET Caloo Ltd www caloo co uk info caloo co uk...

Страница 4: ...INSTALLATION Model No CV 606 Stepper 2 IMPACT AREA AND TRAINING SPACE Area Size 3969mm x 3381mm 11 m2 Required Surface Any Caloo Ltd www caloo co uk info caloo co uk 1500 1500 1500 R 1 5 0 0 3381 3969...

Страница 5: ...CRETE SURFACE For this type of mounting area a concrete block is needed All dimensions in mm INSTALLATION Model No CV 606 Stepper Caloo Ltd www caloo co uk info caloo co uk 3 FOUNDATION OPTIONS pylon...

Страница 6: ...into the concrete block 3 Wait for the concrete block to cure completely Recommended curing time 48 hours A Pylon Expansion Bolts 1 Make sure the concrete surface is clean and flat 2 Drill 4 expansion...

Страница 7: ...lean surface 3 Check for cracks or open areas in the painted coating 4 Check the dial on the pylon Turn the dial clockwise or anticlockwise to see if the turning is smooth 5 Check the screws and bolts...

Страница 8: ...nel 3 Disassemble the side panels from the unit 4 Place the unit onto the mounting surface As shown above 5 Tighten the foundation bolts or the expansion bolts Use a socket set and straight bar to tig...

Страница 9: ...s the screws have a half round head 5 Check the plastic pipe caps 6 Check the plastic grips and pedals 6 2 TESTING 1 Make sure all the screws and bolts have been tightened before testing 2 Place both...

Страница 10: ...loo Ltd www caloo co uk info caloo co uk DIAGRAM Model No CV 606 Stepper Y Q1 Q2 Q3 G R R R Dial 30A 23V Design is subject to change without notice Bridge Rectifier 160A self excited generator 300W 24...

Страница 11: ...uk DIAGRAM Model No CV 606 Stepper 8 EXPLODED VIEW 2 4 5 6 3 1 C 7 8 32 31 33 34 36 37 38 39 48 47 42 43 46 44 45 41 40 C 7 8 9 12 10 11 19 18 14 17 16 15 13 20 27 21 26 36 34 22 23 24 25 A A 28 53 35...

Страница 12: ...40 185 2 SS400 9 Rectangle Shackle Plate Weldment 1 9 1 Rectangle Shackle Left Sleeve 40 31 1 45 9 2 Rectangle Shackle Right Sleeve 48 36 1 ZG200 9 3 Connecting Plate 8T 30 30 1 SS400 10 Closing Ring...

Страница 13: ...hronous Belt Wheel Large 1 Q235 36 6902 Bearing 6902 2 37 6204 Bearing 6204 6 38 6204 Unilateral Bearing 6204 1 39 Nut M12 2 40 Synchronous Belt Wheel Large 1 Q235 41 Synchronous Belt Wheel Small 1 Q2...

Страница 14: ...the nut cap covering a bolt try to rotate the cap If it rotates the bolt needs to be tightened 2 To access the bolt you need to remove the nut cap top tap gently a screwdriver through the cap top and...

Страница 15: ...or replace the anchorage to remove the unit Open the side panels to check the foundation 8 Clean soiled areas on the fitness unit with soap and water Pay particular attention to stations installed in...

Отзывы: