15
Install Guide
Proprietary Information: Not for use or disclosure except by written agreement with Calix.
.
Site Preparation
Before you install any GigaSpire, you need to consider the routing of the power adapter cord
and Ethernet cable (if used).
Power Cords
To complete the installation, a power cord in one of two configurations is required:
GigaSpire Connectorized Power and Signal Cable - A 2-pin barrel connector to the local
AC power receptacle (Type A).
GigaSpire 8-pin connectorized power and signal cable - for use with the optional
Universal Power Supply (UPS).
Before you Begin
Before starting the installation process, check that the following conditions are met:
Ensure the site preparation steps are complete based on the model being installed.
Ensure that all components are on-site and readily available to complete the installation.
The customer is aware of your planned visit and will provide access to the inside of the
home.
Note:
It is critical that you maintain the proper airflow in and around the unit. GigaSpire
devices are designed for surface mounting only. Do not install cabinetry or other building
material around the outside of the unit.
Содержание GigaSpire BLAST u12 GS202xE
Страница 1: ...GigaSpire BLAST Installation Guide March 2020 220 01209 Rev 11...
Страница 2: ......
Страница 4: ......
Страница 17: ...17 Install Guide Proprietary Information Not for use or disclosure except by written agreement with Calix...
Страница 27: ...27 Install Guide Proprietary Information Not for use or disclosure except by written agreement with Calix...
Страница 41: ...41 Install Guide Proprietary Information Not for use or disclosure except by written agreement with Calix...