background image

Questions? 

(888) 788-2254

www.CaliBamboo.com

GeoWood

®

 Flooring Installation Guide

Floating Click-Lock GeoWood Plank Installation (Pages 3-8)

Before you begin installation, remember to P.A.C.E. yourself with the checklist below. Full installation 
instructions and maintenance guidelines can also be found online at

 

www.CaliBamboo.com

Pre-Installation

P A C E

EXPANSION

GAPS

GeoWood flooring can be used in areas ranging from 

50°F to 100°F.  The ideal indoor humidity range for 

GeoWood is 35-65% relative humidity.

Leave at least 3/8” expansion spaces between flooring and 
ALL vertical objects (walls, cabinets, pipes, etc.) Large flooring 
runs may require additional expansion space. Flooring runs 
over 40 feet require additional expansion space or 
transitional pieces.
 Undercut door jambs and casings to 
provide adequate expansion space. Do not screw or nail 
cabinetry or other permanent fixtures to a floating floor.

50-100°

F

3/8” Expansion Gap

3/8” Spacer

Baseboard

PA C E

CONTROL 

ENVIRONMENT

Make sure the subfloor is flat, level, clean and free of 

debris. New concrete must be cured for at least 60 days. 

Test the subfloor moisture prior to installation and apply 

an appropriate moisture barrier such as 6mil Plastic on 

concrete subfloors.

Use 6mil Plastic on Concrete

PA C E

ACCLIMATE 

FLOORING

For GeoWood flooring, lay boxes flat on the floor and only 
open box ends as shown above.

 Acclimate your floor as 

close to the installation area as possible, for 24 hours in 

normal living conditions.

Acclimate Your GeoWood Flooring for 24 hrs

P

A C E

PREPARE 

THE SUBFLOOR

35-65% 

rH

Page 4

Содержание Geowood

Страница 1: ...888 788 2254 www CaliBamboo com Oak and Bamboo Flooring Installation Guide Floating Click Lock...

Страница 2: ...k 5 19 32 Wide Plank Dims 36 1 4 L x 5 19 32 W x 1 4 H Oak Wide Click 7 15 32 Wide Plank Dims 74 13 16 L x 7 15 32 W x 11 32 H Quarter Round Quarter Round 12 Air Register 1 4 Threshold 11 32 Threshold...

Страница 3: ...Questions 888 788 2254 www CaliBamboo com GeoWood Flooring Installation Guide Page 3 FLOATING CLICK LOCK INSTALL GUIDE...

Страница 4: ...s over 40 feet require additional expansion space or transitional pieces Undercut door jambs and casings to provide adequate expansion space Do not screw or nail cabinetry or other permanent fixtures...

Страница 5: ...disclaims all liability for any errors or improprieties in the installation of its products by an installer Floor noise is normal and will vary from one installation type to the next Occasional noise...

Страница 6: ...he flooring and create mold or mildew The installer not Cali Bamboo is responsible for making sure the concrete moisture and alkalinity are suitable prior to installing this floor Ceramic Tile resilie...

Страница 7: ...everal cartons at the same time to ensure good color shade and appearance Expansion gaps Even though Cali Bamboo GeoWood Planks will have very minimal expansion and contraction it is still required to...

Страница 8: ...d in front of kitchen sinks and in high traffic areas Although the Cali GeoWood Flooring is water resistant it is still a best practice to avoid excessive moisture on the floor Therefore we recommend...

Отзывы:

Похожие инструкции для Geowood