background image

Installation

Before  installing  the  device,  make  sure  that  the  system  has  been  flushed  and  cleaned  to

remove any traces of dirt that may have accumulated during installation.

The device must only be installed in vertical position, as shown in the diagram, so as to permit

a free and unrestricted downward flow of the water as it drains out.

The  device  must  be

installed  at  the  points  of

the  circuit  which  are  at

risk  of  freezing,  so  that

water  may  flow  freely

and  in  order  to  prevent

pipes, 

storages 

or

components 

located

upstream  of  the  device

from freezing.

Installation on a dead leg is advisable for avoiding any risk of damage of the device caused

by overheating from the solar collector, in case of stagnation conditions.

3

PN10

PN10

PN10

Application diagram on solar system

T

max

= 180

ϒ

C / 360

ϒ

F

P

max

= 10 bar / 150 psi

SOLAR

COLLECTOR

SOLAR

COLLECTOR

DEAD LEG

250-300 mm

Отзывы: