background image

Shut-off and check valves

The shut-off valves are 
equipped with a built-in check 
valve, positioned inside the ball.

1.  To allow the passage of the 

medium in both directions, the 
ball valves must be opened to 
45° using a 9 mm hex wrench 
(supplied with unit). 

  

The check valve is opened by 
the ball, see figure (A). 

2.  In normal system operation, 

the ball valves must be fully 
open.

A

Complete closing and opening of the valve

The valve can be fully 

closed or fully open.

A slot on the valve 

adjusting stem indicates 

the status of the valve.

Correction for different density liquids

Changes in flow rate readings remain within the indicated 

accuracy (±10%) for glycol percentages of up to 50%. 

Fully closed

Fully open

6

7

Captive nut

Flow rate adjustment

1/2” F fitting

Graduation

3/4” F fitting

Flow meter

The flow meter is a flow rate measuring device, float equipped, with 
an adjustment ball valve. 
The meter has a range of 2 to 8 gpm.

The flow meter must always be installed in a vertical position.

A thermometric label on the back of the flow meter signals if the 
maximum permitted temperature (230°F/110°C) has been exceeded: 
white = temperature not exceeded;
dark = maximum temperature exceeded.
Warranty will be void if this label is removed.

The reading is taken from 

the top edge of the float

Important!

 Use only a 9mm 

hex wrench (supplied with unit) 

to adjust the flow meter.

 8

 7

 6

 5

open

closed

230 F

110

C

Thermometric 

label

A

B

Correct 

position

Incorrect 

position

Air separator 

The solar pump stations with supply and return connections (279 
series) are equipped with an air separator on the flow line. The gases 
separated from the heat transfer medium collect at the top of the air 
separator. The collected gases must be evacuated from time to time 
(every day after putting into operation and afterwards, depending on 
the quantity of air, once a week or once a month) by opening the 

manual air vent with a suit-
ably sized screwdriver.
To maintain optimal 
efficiency of the solar 
thermal system, after-
wards, it is necessary 
to discharge air from the 
system every six months 
using the air separator.

Содержание 279 series

Страница 1: ...ntial controller optional is suitable for management and control of 10 pre configured solar thermal system arrangements installed in an optional insulation jacket that mounts to the top of the pump st...

Страница 2: ...ply before carrying out any work Failure in following these instructions may result in injury of persons or damage to property 2 Product range Code 278751A Single line solar pump station with 3 speed...

Страница 3: ...uge scale 32 to 320 F 0 160 C Connections 3 4 female straight thread Hose connection 3 4 M Fill drain connections with hose connection 9 16 OD 15 mm Pump model Solar 15 68 Body cast iron GG 15 20 Elec...

Страница 4: ...with air vent and shut off valve with check valve 7 Supply temperature gauge 8 Return temperature gauge 9 Pre formed shell insulation 10 Shut off ball valve with check valve with temperature gauge ho...

Страница 5: ...t s threaded fittings are tightened and tested in the assembly phase in the factory However use a pressure test to check for leaks during commissioning Make the electrical connections of the system as...

Страница 6: ...ate recommendations when setting the flow rate After the first few operating hours the solar thermal system must be purged of excess air again both in the highest point and on the air separator if equ...

Страница 7: ...always be installed in a vertical position A thermometric label on the back of the flow meter signals if the maximum permitted temperature 230 F 110 C has been exceeded white temperature not exceeded...

Страница 8: ...ation diagrams Shut off valve Pump Air vent Expansion tank Temperature gauge Safety valve Automatic filling 2 Shut off valve Pump Air vent Expansion tank Temperature gauge Safety valve Automatic filli...

Отзывы: