Pouring the In-Ground Spa Deck

It is recommended that all electrical hook ups and all plumbing be com-

pleted before pouring the concrete. Make certain all electrical inspections 

on lights, bonding and all other electrical work have been completed and 

checked off by the local inspectors prior to proceeding with your concrete 

or finish work. It is a good idea to run the spa for at least 24 hours before 

pouring  the  concrete  to  insure  there  are  no  leaks.  We  understand  you 

want to enjoy your spa now, but a 24-hour period with your spa running 

will let you know of any problems before they will be extremely hard to 

fix.

The  type  of  decking  you  have  selected  will  have  determined  the  grade 

of the spa. If you are pouring a regular deck up to the spas coping, then 

the top of the coping should be 4” above the surrounding area. In either 

event,  it  is  recommended  to  dig  out  an  area  around  the  spa  exposing 

the flange of the coping and just under it. This is important, as concrete 

should be packed under and over the flange of the spa, as the deck is 

poured. This will lock the spa into the concrete and provide for a much 

stronger bond of the spa to the deck. It will also eliminate cracking of the 

deck where it meets the spa. 
When setting your outside forms, remember you want any water from rain 

or splash out to run off the deck, not into the spa. If your deck is going to 

tie into an existing deck, than some type of drain system should be planned 

to handle the run off. Proper drainage planning is very important. 

An experienced concrete finisher should always be used when pouring spa 

decks, especially when you are doing a cantilevered deck, as the forms 

must be taken off at the proper time to allow finishing of the inside of the 

form. 

Содержание Avalon A526

Страница 1: ......

Страница 2: ...e contact LMS Customer Service Department 1462 East Ninth Street Pomona CA 91766 Toll Free 1 800 CAL SPAS Fax 1 909 629 3890 www calspas com Contents Pre Delivery and Installation Checklist 1 Planning the Best Location 2 Portable Spa Site Preparation 4 In Ground Spa Site Preparation 4 Getting the Spa Into Your Yard 6 Electrical Requirements 8 Electrical Requirements US and Canada 8 Electrical Inst...

Страница 3: ...to install their own in ground spas bear sole re sponsibility for any performance or warranty issues and may void portions of their warranty as a result For this reason we strongly recommend they hire an experienced professional for their installation For additional operating and installation information please see your sell ing dealer Portable Spa Pre Delivery Checklist Before Delivery Plan your ...

Страница 4: ... entry By doing this you will have a place to change clothes and not be uncomfortable Consider your privacy In a cold weather climate bare trees won t provide much privacy Think of your spa s surroundings during all seasons to determine your best privacy options Consider the view of your neighbors as well when you plan the location of your spa Provide a view with your spa Think about the direction...

Страница 5: ...es does not make too much noise for spa owners and or neighbors Ensure the equipment can be easily serviced for filter cleaning and periodic inspections in the location chosen If you are using a gas heater you will need to consider wind and drafts as well as heater exhaust for proper heater placement See heater owner s manual for important location and safety information The equipment base and hea...

Страница 6: ...or to ensure the structure will support the weight of 150 pounds per square foot To properly identify the weight of your new spa when full remember wa ter weighs 8 33 lbs per gallon For example an average 8 spa spa holds approximately 500 gallons of water Using this formula you will find that the weight of the water alone is 4 165 lbs Combined with the dry weight of the spa you will note that this...

Страница 7: ...e bottom contact points Be sure not to seal the bottom off and making a sealed box You will need adequate water drainage for escape under the spa A gravel beds around the concrete base will help with this Site Excavation Sand Bottom With the spa area and all elevations planned including your decided type of decking you are now ready to proceed with the dig An ideal excavation is one that is as clo...

Страница 8: ...Are there low roof eaves overhanging branches or rain gutters that could be an obstruction to overhead clearance 8 spas need at least 42 wide gate and 9 height clearance If the delivery route will require a 90º turn check the measurements at the turn to ensure the spa will fit Are there protruding gas meters water meters or A C units on your home which will cause obstructions along the delivery pa...

Страница 9: ...LTR20091024 Rev A 7 ...

Страница 10: ...ectrical contractor and approved by a local building electrical inspector GFCI and Wiring Requirements The power supplied to the spa must be on a dedicated GFCI protected circuit as required by ANSI NFPA 70 with no other appliances or lights sharing the power Use copper wire with THHN insulation Do not use aluminum wire Use the table on the next page to determine your GFCI and wiring require ments...

Страница 11: ... Service 2 One 30 amp GFCI Service 1 Four 8 AWG copper wires Service 2 Three 8 AWG copper wires FP4700 spa Service 1 swim side One 60 amp GFCI Service 1 Four 8 AWG copper wires Service 2 swim side One 30 amp GFCI Service 2 Three 8 AWG copper wires Service 3 spa side One 40 amp GFCI Service 3 Four 8 AWG copper wires In Ground Spas Designer in ground spas with one 5 5 kW heater One 50 amp GFCI Four ...

Страница 12: ...gain Configuring the 6300 Control System The 6300 control system requires higher power than other 240V systems Dip switch 10 is factory set in the ON position This causes the heater to shut off when any pump is running in high speed To allow the heater to continue operating dip switch 10 must be set to the OFF position To ensure your spa functions properly ensure the following steps are per formed...

Страница 13: ...LTR20091024 Rev A 11 GFCI Wiring Diagram ...

Страница 14: ...d replace it before next usage All 120V spas must have a GFCI This can be either a 20 amp GFCI re ceptacle or a GFCI cord and plug kit as shown at right CKIT110 P N ELE09700086 Testing the GFCI Breaker Test the GFCI plug prior to first use and periodically when the spa is pow ered To test the GFCI plug version follow these instructions Spa should already be plugged in and operational Press the TES...

Страница 15: ...edi cated RCD protected circuit with no other appliances or lights sharing the power Use copper wire with THHN insulation Do not use aluminum wire Use the table on the next page to determine your GFCI and wiring requirements When wires larger than 6 AWG are required install a junction box near the spa and use 6 AWG wire between the junction box and the spa Wire runs over 85 feet must increase wire...

Страница 16: ...one 5 5 kW heater and one 3 kW heater Service 1 One 32 amp RCD or two 16 amp RCDs Service 1 Three 10 AWG copper wires Service 2 One 32 amp RCD Service 2 Three 10 AWG copper wires FP4700 spa Service 1 swim side One 32 amp RCD Service 1 Three 10 AWG copper wires Service 2 swim side One 32 amp RCD Service 2 Three 10 AWG copper wires Service 3 spa side One 32 amp RCD Service 3 Three 10 AWG copper wire...

Страница 17: ...LTR20091024 Rev A 15 RCD Wiring Diagram ...

Страница 18: ...LTR20091024 Rev A 16 Installing the In Ground Shell ...

Страница 19: ...hown below is typical for a system with two pumps with external heater and external filter Designer Spa Specifications DIJ401 and DIJ405 Equipment pack weight 250 lbs DIJ407 Equipment pack weight 300 lbs 2 5 HP heat pump 4 HP swim pump Note Equipment pack cannot ex ceed 15 feet from spa ...

Страница 20: ...LTR20091024 Rev A 18 ...

Страница 21: ...are clearly marked during water testing at the factory This is done to assist installers in properly identifying the installa tion We still recommend that the installers verify plumbing lines prior to gluing This can be done by using one of the following techniques Air Test The air test requires a wet dry vacuum Locate the plumbing line you wish to identify and secure the vacuum hose to cut open e...

Страница 22: ...oth above and below ground installations In most cases the use of flexible PVC plumbing is acceptable when properly buried in trenches Most water plumbing lines are 2 or larger and must be schedule 40 or heavier PVC When plumbing minimize the use of 90 elbows as much as possible The use of 45 elbows will increase the amount of jet pressure you will have over the use of 90 elbows The plumbing on th...

Страница 23: ...o the extension 3 loom NOTE This connection must be kept dry We recommend that a water proof junction box be used in installations where moisture could penetrate this terminal connector Lay out the extension loom to verify that you have enough length to 4 reach the control box Remember that conduit runs are not generally run in a straight line Every bend and up and down run consumes line length Ta...

Страница 24: ...run through the conduit repeat steps 5 and 6 above In Ground Spa Light Installation Instructions On spas ordered with in ground lights the factory installs the light niche for you The next steps of installation should be performed by a qualified licensed electrician Always read and follow light manufacturer s safety and installation instruc tions prior to installation and operation Incorrect insta...

Страница 25: ...light cord slack around back of light housing and attach light to 3 niche with mounting screw Cut the cord at the junction box leaving at least 6 15 cm of cord to 4 make connections Strip 6 15 cm of the out cord jacket to expose the three insulat 5 ed wires Be careful not to damage the insulation on the three inner wires Connect the three wires to the corresponding circuit wires in the junc 6 tion...

Страница 26: ...LTR20091024 Rev A 24 ...

Страница 27: ...ng then the top of the coping should be 4 above the surrounding area In either event it is recommended to dig out an area around the spa exposing the flange of the coping and just under it This is important as concrete should be packed under and over the flange of the spa as the deck is poured This will lock the spa into the concrete and provide for a much stronger bond of the spa to the deck It w...

Страница 28: ... A734B 84 84 39 425 850 Lbs 4390 Lbs A734L 84 84 39 425 850 Lbs 4390 Lbs A744B 84 84 39 425 850 Lbs 4390 Lbs A744L 84 84 39 425 850 Lbs 4390 Lbs A826B 93 93 39 450 900 Lbs 4648 Lbs A826L 93 93 39 450 900 Lbs 4648 Lbs A834B 93 93 39 450 900 Lbs 4648 Lbs A834L 93 93 39 450 900 Lbs 4648 Lbs A844B 93 93 39 450 900 Lbs 4648 Lbs A844L 93 93 39 450 900 Lbs 4648 Lbs A857B 93 93 39 450 900 Lbs 4648 Lbs A85...

Страница 29: ...CV 35 93 84 39 450 900 Lbs 4648 Lbs CA 65 93 93 39 450 900 Lbs 4648 Lbs CA 36 93 93 39 450 900 Lbs 4648 Lbs CBA 36 93 93 39 450 900 Lbs 4648 Lbs CD 46 93 93 39 450 900 Lbs 4648 Lbs CM 47 93 93 39 450 900 Lbs 4648 Lbs CA 50 93 93 39 450 900 Lbs 4648 Lbs CBA 50 93 93 39 450 900 Lbs 4648 Lbs CBA 64 93 93 39 450 900 Lbs 4648 Lbs CN 50 93 130 39 800 1200 Lbs 7864 Lbs CN 65 93 130 39 800 1200 Lbs 7864 L...

Страница 30: ...800 Lbs 4340 Lbs F745L 84 84 35 425 800 Lbs 4340 Lbs F748L 84 84 35 425 800 Lbs 4340 Lbs F830B 93 93 35 450 900 Lbs 4648 Lbs F830L 93 93 35 450 900 Lbs 4648 Lbs F845B 93 93 35 450 900 Lbs 4648 Lbs F845L 93 93 35 450 900 Lbs 4648 Lbs F848L 93 93 35 450 900 Lbs 4648 Lbs F864L 93 93 35 450 900 Lbs 4648 Lbs Escape Series Model Width Length Depth Gallons Dry Weight Filled Weight EIII732B 84 84 39 425 8...

Страница 31: ...02 52 2000 285 2950 Lbs 21985 Lbs Victory Extreme Series Model Width Length Depth Gallons Dry Weight Filled Weight VX 901 72 72 30 130 600 Lbs 1583 Lbs VX 624B 76 84 34 325 730 Lbs 3437 Lbs VX 724L 78 84 32 340 740 Lbs 3572 Lb s VX 726B 84 84 39 425 800 Lbs 4340 Lbs VX 726L 84 84 39 425 800 Lbs 4340 Lbs VX 740L 84 84 39 425 800 Lbs 4340 Lbs VX 834B 93 93 39 425 800 Lbs 4340 Lbs VX 834L 93 93 39 42...

Страница 32: ...LTR20091024 Rev A 12 15 08 LMS Customer Service Department 1462 East Ninth Street Pomona CA 91766 Toll Free 1 800 CAL SPAS Fax 1 909 629 3890 www calspas com ...

Отзывы: