COMMISSIONING 9
POST-LAUNCH CHECK LIST
1) All seacocks open and water tight .
2) Shaft aligned to .003” tolerance .
3) Engine shaft packing nut tightened . (See Stuffing Box under Engine Operation Instructions .)
4) Engine oil levels checked .(Refer to Engine Manual .)
5) Fuel tank filled and system checked for leaks .
6) Engine operates and passes water thru exhaust .
7) Engine controls operate correctly and checked for tight nuts, bolts, and spread cotter pins .
8) Mast stepped and mast collar installed . (Collar on Cal 35 and Cal 39 only .)
9) Mast bolted to mast collar ears .*
10) Turnbuckles attached; cotter pins spread and taped .
11) Boom and running rigging installed .
12) Water tank filled . (See Note 2 – Water Heater .)
13) Faucets work and lines checked for leaks .
14) Stove fuel tank filled; system checked for leaks . (Refer to Propane Stove Instructions, if applica-
ble .)
15) Electrical equipment operational . (See Note 1 for Shore-Power System .)
16) Steering gear operational .
17) Rudder shaft greased .
18) Bilge pump operational .
19) Toilets operational; hoses secure .
20) Deck hardware checked for leaks .
21) Warranties and manuals delivered to owner .
(After first light-air sail . See Instructions .)*
Содержание CAL 27 Mk III
Страница 1: ...Owner s Manual ...
Страница 6: ...6 CAL 27 Mk III BOAT DIMENSIONS ...
Страница 7: ...CAL 27 Mk III BOAT DIMENSIONS 7 BANGOR PUNTA MARINE CAL 27 III ARRANGEMENT 10 28 1982 JPF ...
Страница 13: ...Wire Rigging 13 WIRE RIGGING ...
Страница 26: ...26 WATER SYSTEM BANGOR PUNTA MARINE CAL 27 III STANDARD WATER SYSTEM 10 6 1982 JPF ...
Страница 27: ...WATER SYSTEM 27 BANGOR PUNTA MARINE CAL 27 III PRESSURE WATER OPTION 10 6 1982 JPF ...
Страница 29: ...COOKING STOVES PROPANE STOVES 29 BANGOR PUNTA MARINE CAL 27 III THRU HULL LOCATIONS 10 6 1982 JPF ...
Страница 38: ......