CAI MEZZANINE GATE Скачать руководство пользователя страница 11

 

11 

 
 
               
 
 
 
 
 
 
 
 
 
 

 
From Mezzanine, open Gate as shown. 
 
Remove Pallet from Loading Area. Close Inside Gate. Move Pallet to desired location. 
 
Closing Inside Gate before leaving Gate Area will open Gate at edge of Mezzanine. 
This allows Fork Lift drivers to load Pallets without having to get off the Fork Lift. 

Replacement Parts List:     

Call Toll Free 1-800-328-9522 to place an order.

 

Support Channel  

 

423922S 

Pole Option 

 

 

405980 

Gas Strut   

 

 

154130 

Ball End for Gas Strut   

154105 

Keys for Gate Shaft 

 

110094 

Locking Collars   

 

152797 

Warning Decals (FREE) 

161225 

Bumpers   

 

 

155397 

Gate Stop-LH 

 

 

408701Z 

Gate Stop-RH 

 

 

408702Z 

 
Installation of Hardware for Pole Option. 

 
Install hardware as shown through 
the hole in square tube of Outer Gate. 
 
Pole hooks onto threaded portion of Bolt 
 
 
 
 
 
 

 

 

 

DISTRIBUTED BY CAI SAFETY SYSTEMS | Phone: (888) 246 6999 | Web: caisafety.com | Email: [email protected]

Содержание MEZZANINE GATE

Страница 1: ...t to them if necessary Letting poorly trained workers use this system can result in property damage and or serious injury or death to personnel WARNING MEZZANINE GATE System must be installed accordin...

Страница 2: ...ary structure at the mezzanine edge Site Preparation 1 Move all tools and trip hazards a minimum of 10 ft back from mezzanine edge 2 Be sure you are installing the MEZZANINE GATE System to a permanent...

Страница 3: ...d Gate System handles 48 wide pallets and weighs 270 lbs Consult factory for weights of custom size Gate Systems DISTRIBUTED BY CAI SAFETY SYSTEMS Phone 888 246 6999 Web caisafety com Email info caisa...

Страница 4: ...will be to your left side as you look out over mezzanine Make sure edge of Plate is 4 back from edge of mezzanine Mark holes through the Plates Drill holes in mezzanine floor to show you where to dri...

Страница 5: ...zanine floor using hardware supplied by Garlock Equipment Co Continue this process until all 10 bolts have been installed and Left Frame is completely secured to mezzanine floor DISTRIBUTED BY CAI SAF...

Страница 6: ...ft Lift Outer Gate and slide Right Frame into a position where Gate will rest on Vertical Post of Right Gate Install Bumpers 155397 into the tops of the vertical posts of the Right Frame of the Mezzan...

Страница 7: ...e to mezzanine floor in the same manner you previously installed Left Frame Secure Inside Gate and Outside Gate using Locking Collars 152797 and Allen Wrench Make sure Key is still in its proper place...

Страница 8: ...ng down Locate pre drilled hole in Collar near the Inside Gate Using drill bit supplied with Gate drill through Rod Insert bolt and nut supplied with Gate through this hole and secure with wrenches DI...

Страница 9: ...ther Guard installs from outside the Pallet area Install Gate Stop LH 408701Z RH 408702Z onto Bracket beneath each Gate Use 3 8 x 1 25 Bolt and Lock Nut Install a Rubber Pad 424357 on each side of the...

Страница 10: ...to Mezzanine If Outer Gate is closed use Pole Option p n 405980 to open it See Pg 11 From Ground using Forklift place pallet inside loading area WARNING Before using Gate System make sure all parts a...

Страница 11: ...oll Free 1 800 328 9522 to place an order Support Channel 423922S Pole Option 405980 Gas Strut 154130 Ball End for Gas Strut 154105 Keys for Gate Shaft 110094 Locking Collars 152797 Warning Decals FRE...

Страница 12: ...ng hole as shown Re install Nut and Washer on Bolt from back side of Frame Install the Ball Mount in the lower pre drilled hole and fasten it to the Frame with the Nut and Washer also from back side o...

Отзывы: