
TR-MAN-1100
Operator's Manual - Micro-Travellers
Page 29 of 68
Cadman Power Equipment ▪ BOX 100, Courtland, Ontario, Canada N0J-1E0 ▪ Phone: 519-688-2222 ▪ Fax: 519-688-2100 ▪ www.cadmanpower.com
Step 3
Use the cable tie anchors (42-647) and cable ties (42-391) to secure the solar panel
harness in place. Make sure the harness is secure to the frame and cannot be caught
on the hose drum of the traveller.
WARNING: Unsecure and loose wires can become caught and may cause
damage to the equipment.
Figure 32
– Solar Panel Harness Tie Down and Connections
img-00735
Step 4
Once the harness is connected and anchored down, plug the battery back into the
traveller, and pull the E-stop out to turn the power
ON.
Verify that the solar panel is
working by placing the unit in a sunny location. Check the battery percentage on the
control panel screen, record the percentage, then come back in about 10 mins and the
percentage should be higher then what was recorded.
Figure 33 - Solar Panel Assembly Completed
img-00752