Installing the SWPIM-BRI
SWPIM-BRI Installation Guide
1-3
Figure 1-1
Installing the SWPIM-BRI into the Host Platform
8. Fasten the SWPIM-BRI with the thumbscrew.
9. Replace power to the host platform, if necessary. Check to see that the
host platform LED indicators go to their normal configuration. If they
do not, remove the SWPIM-BRI from the host platform and contact
Cabletron Systems.
10. The SWPIM-BRI must be configured before the WAN connection is
made. Once the SWPIM-BRI has been configured, the host platform
must undergo a soft or hard restart in order for the SWPIM-BRI to be
recognized and for traffic to pass. Refer to the appropriate software
manual to configure the SWPIM-BRI.
!
CAUTION
Do not connect any WAN cables until the SWPIM-BRI has been
configured in software. The phone company can shut down a
line that has an unconfigured connection on it.
install
Network Connector End
View of Host Connector End
Host Platform
SWPIM-BRI
SWPIM-BRI
LNK
STS
Rail Guides
Thumbscrew
Содержание SWPIM-BRI
Страница 1: ...SWPIM BRI LNK STS Title Page SWPIM BRI Installation Guide 9033038 02 ...
Страница 2: ......
Страница 12: ...Notice x SWPIM BRI Installation Guide ...
Страница 14: ...Contents xii SWPIM BRI Installation Guide ...
Страница 20: ...Introduction xviii SWPIM BRI Installation Guide ...
Страница 26: ...Chapter 1 Installation 1 6 SWPIM BRI Installation Guide ...