Unpacking and Installing Your ELS10-26
2-15
b. Verify proper crossing over of fiber strands between the
applicable port on the ELS10-26 and the fiber optic device
at the other end of the fiber optic link segment.
c. Verify that the fiber connection meets the dB loss
specifications.
If a Link has not been established, contact Cabletron Systems
Global Call Center. Refer to Section 1.2, Getting Help, for details.
The ELS10-26 is now ready to be set up through Local
Management. Refer to Chapter 4, Monitoring and Managing Your
ELS10-26
, to configure the ELS10-26.
Содержание SmartSTACK 10 ELS10-26
Страница 2: ......
Страница 10: ...viii Contents ...
Страница 48: ...2 16 Unpacking and Installing Your ELS10 26 ...
Страница 92: ...5 8 ELS10 26 Diagnostics and Troubleshooting ...
Страница 112: ...B 12 Glossary ...
Страница 116: ...Index I 4 W wiring crossover A 6 straight through A 5 ...