B-5
SCP Diagnostics
B.1.2.3
DRAM Chip Test
This test checks the functionality of a DRAM chip. It takes about two seconds
to run.
=>test-dc a
DRAM chip: OK
B.1.2.4
Ethernet Test
This test checks the functionality of the Ethernet chip. It takes about two sec-
onds to run.
=>
test-ethernet
Ethernet: OK
B.1.2.5
FLASH Test
This test checks the functionality of each FLASH chip. It takes about five min-
utes to run.
NOTE:
It is recommended that you back up your
CDB before running this test. The chips are
saved before testing each one and then
restored. However, if a power failure would
occur or if the switch were rebooted during
the test, some of the data may not be restored
properly.
=>
test-flash
Flash Test
Save Chip 0
Erase Chip
Pattern 0
Erase Chip
Pattern 1
Erase Chip
Pattern 2
Erase Chip
Pattern 3
.
Содержание MMAC-Plus 9A000
Страница 1: ...MMAC Plus 9A000 SFCS 200BX SFCS 200WG and SFCS 1000 ATM SWITCH User s Guide...
Страница 2: ......
Страница 17: ...1 3 Introduction Figure 1 1 9A000 Switch Configuration...
Страница 22: ...1 8 Introduction...
Страница 26: ...2 4 Installing the 9A000...
Страница 50: ...3 24 Switch Hardware...
Страница 84: ...5 18 Hardware Maintenance Procedures...
Страница 157: ...C 31 Hardware Specifications...
Страница 158: ...C 32 Hardware Specifications...
Страница 180: ...g 22 GLOSSARY...