Installing the SmartSwitch 9000 Module
2-6
Figure 2-3. Installing the 9F426-03 Module
Metal Back-Panel
Module Guides
Module
Jack for ESD
Wrist Strap
Plastic Tab
Warning:
Ensure that the circuit card is between the
card guides.
Lock down the top and bottom plastic tabs
at the same time, applying even pressure.
Содержание 9F426-03
Страница 1: ...903number SmartSwitch 9000 9F426 03 User s Guide...
Страница 2: ......
Страница 13: ...1 3 Introduction Figure 1 1 The 9F426 03 Module SMB CPU INB 9F426 03 FDDI...
Страница 22: ...Installing the SmartSwitch 9000 Module 2 8...
Страница 36: ...FPIM Specifications A 4...