background image

 

iii

Notice

 

DECLARATION OF CONFORMITY

ADDENDUM

 

Application of Council Directive(s):

 

89/336/EEC
73/23/EEC

 

Manufacturer’s Name:

 

Cabletron Systems, Inc.

 

Manufacturer’s Address:

 

35 Industrial Way
PO Box 5005
Rochester, NH 03867

 

European Representative Name:

 

Mr. J. Solari

 

European Representative Address:

 

Cabletron Systems Limited
Nexus House, Newbury Business Park
London Road, Newbury
Berkshire RG13 2PZ, England

 

Conformance to Directive(s)/Product Standards:

 

EC Directive 89/336/EEC
EC Directive 73/23/EEC
EN 55022
EN 50082-1
EN 60950

 

Equipment Type/Environment:

 

Networking Equipment, for use in a 

 

Commercial or Light

 

Industrial Environment.

 

We the undersigned, hereby declare, under our sole responsibility, that the equipment packaged with 
this notice conforms to the above directives.

Manufacturer

Legal Representative in Europe

Mr. Ronald Fotino

Mr. J. Solari

 

____________________________________________________

______________________________________________________

 

Full Name

Full Name

Principal Compliance Engineer

Managing Director - E.M.E.A.

 

____________________________________________________

______________________________________________________

 

Title

Title

Rochester, NH, USA

Newbury, Berkshire, England

 

____________________________________________________

______________________________________________________

 

Location

Location

Содержание 9F241-12

Страница 1: ...SmartSwitch 9000 9F241 12 User s Guide 9031203 01...

Страница 2: ......

Страница 3: ...AMAGES WHATSOEVER INCLUDING BUT NOT LIMITED TO LOST PROFITS ARISING OUT OF OR RELATED TO THIS MANUAL OR THE INFORMATION CONTAINED IN IT EVEN IF CABLETRON SYSTEMS HAS BEEN ADVISED OF KNOWN OR SHOULD HA...

Страница 4: ...in which case the user will be required to correct the interference at his own expense WARNING Changes or modifications made to this device which are not expressly approved by the party responsible fo...

Страница 5: ...Equipment for use in a Commercial or Light Industrial Environment We the undersigned hereby declare under our sole responsibility that the equipment packaged with this notice conforms to the above di...

Страница 6: ...Notice iv...

Страница 7: ...witch 2 3 Installing the Module into the SmartSwitch 9000 Chassis 2 5 The Reset Switch 2 7 Chapter 3 Operation Flexible Network Bus FNB 3 1 System Management Buses 3 2 SMB 1 Bus 3 2 SMB 10 Bus 3 2 Sys...

Страница 8: ...Contents vi...

Страница 9: ...ocessor The 9F241 12 is equipped with an advanced Intel i960 microprocessor This microprocessor provides a platform for all management functions within a scalable RISC based architecture Management Ma...

Страница 10: ...built in visual diagnostic and status monitoring system With LANVIEW LEDs you can quickly identify the device port and physical layer status at a glance Hot Swapping The 9F241 12 can be installed or r...

Страница 11: ...1 3 Introduction Figure 1 1 The 9F241 12 module 1 5 M 1 M 2 M 3 M 4 M 5 M 6 M 9 M 10 9 4 8 12 M 7 M 8 M 11 M 12 SMB CPU FNB 9F241 12 FDDI...

Страница 12: ...ing mode switches rebooting the unit etc The serial and revision numbers of all involved Cabletron Systems products in the network A description of your network environment layout cable type etc Netwo...

Страница 13: ...precautions to prevent damage from Electrostatic Discharge ESD 3 Carefully examine the module checking for damage If any damage exists DO NOT install the module Contact Cabletron Systems Technical Su...

Страница 14: ...Installing the MicroLAN Module 2 2 Figure 2 1 User Accessible Components SMB 1 PROM i960 Processor Flash SIMM Socket Boot PROM DIP Switch...

Страница 15: ...ing the Module Card DIP Switch An eight position DIP switch is located on the module card as shown in Figure 2 1 and Figure 2 2 The functions of the switches are listed in Table 2 1 Figure 2 2 Locatio...

Страница 16: ...ers which are stored in NVRAM when the module is powered down and remain there until the switch is toggled again 6 Force BootP Download Toggling this switch after pulling the board out of the SmartSwi...

Страница 17: ...le is being mounted in All other slots must be covered if modules are not being installed to ensure proper airflow and cooling 3 Attach one end of the ESD wrist strap packaged with the SmartSwitch 900...

Страница 18: ...ing the SmartSwitch 9000 Module Metal Back Panel Module Guides Module Jack for ESD Wrist Strap Plastic Tab Warning Ensure that the circuit card is between the card guides Lock down the top and bottom...

Страница 19: ...ressing the Reset switch twice within three seconds causes the processor i960 to reset Pressing and holding the switch on for three or more seconds causes the module to shutdown Pressing and holding i...

Страница 20: ...Installing the MicroLAN Module 2 8...

Страница 21: ...ock Diagram Flexible Network Bus FNB The FNB consists of two dual FDDI networks FNB 1 and FNB 2 providing up to 400 Mbps of data bandwidth These FDDI networks are 100 ANSI FDDI compliant supporting SM...

Страница 22: ...Interface Module EPIM located on the front of the Environmental Module Through an EPIM connection full SNMP management of the SmartSwitch 9000 is available out of band from user data Modules that sha...

Страница 23: ...12 module has a dual attachment to the FNB backplane connecting to both FNB 1 and FNB 2 The module can insert into the FNB or bypass it These flexible configuration options make the SmartSwitch 9000 i...

Страница 24: ...Operation 3 4...

Страница 25: ...the status of the module and may be used as an aid in troubleshooting Shown in Figure 4 1 is the LANVIEW LEDs of the concentrator modules Figure 4 1 The LANVIEW LEDs 1 5 M 1 9 4 8 12 SMB CPU FNB 9F241...

Страница 26: ...s LED Color State Description Green Functional Fully operational Yellow Crippled Not fully operational i e one bad port Yellow Green Booting Blinks yellow and green while booting Red Reset Normal powe...

Страница 27: ...he functions of the FDDI Port LEDs are listed in Table 4 4 Table 4 4 FDDI Status LEDs LED Color State Green Link Activity Port enabled Yellow Link No Activity Port enabled Red No link Port disabled Re...

Страница 28: ...LANVIEW LEDs 4 4...

Страница 29: ...EN 55022 Class A VCCI Class I EMC the following requirements EN 50082 1 IEC 801 2 ESD IEC 801 3 Radiated susceptibility IEC 801 4 EFT Service MTBF MHBK 217E 200 000 hrs MTTR 0 5 hr It is the responsib...

Страница 30: ...4 0 H x 3 0 W centimeters 13 8 D x 17 4 H x 1 2 W inches Weight Unit 1360 7 gr 3 lb Shipping 1814 4 gr 4 lb Link Distance Up to two kilometers on multimode fiber optic cable as specified by ANSI MMF P...

Отзывы: