Page
4
1.
Place the face frame
(A)
face down on a flat soft working surface to ensure that the
face is not
scratched
or
damaged
.
(Figure 1)
.
2.
Install the Side Panels (Figure 2):
Insert right and left side panels
(B)
into the grooves
of
the face frame
(A)
and align the cam lock connectors
(Figure 2).
Lock the cam with a screwdriver
by turningthe screw 180° clockwise
(Figure4)
.
3.
Install the Bottom
and Microwave shelf
(Figure 3):
Gently spread the side panels
(B)
and
insert
(C)
&
(D)
into the grooves of side panel
s
(B)
until
they are seated in
the
face frame
(A)
.
4.
Installing the Back Panel and Toe Kick (Figure 5):
Before you start this step, put the
back panel
(E)
on a flat surface facing upward. Install the drawer
slide supports
(
f
)
in the pre‐
spotted area on the back panel
(Figure 6).
The
bottom of the slide supports should be facing
the bottom groove
. Secure them with 2 screws
each
(e)
(
Figure 6).
Then
install
the back panel
(E)
to the
rear of side panel
s
(B) (Figure 5)
. Align and lock each cam lock. Install the Toe Kick
(
F
)
by
lockin
G
H
8
.
Installing the Corner Braces (Figure
10
) and inserting the
Drawer:
Place the corner
braces
(b)
on each top corner of the cabinet and secure them with the ½” Corner
Brace Screws
(c)
.
Slide the drawer into the rail
s
and check the drawer position
.
Install the rubber bumpers
(a)
onto
the corners of the
door and
drawer front
(G)
where they contact the frame.
Figure
10
b
b
c
Q
ty
4
Qty
8
6
.
Install
the Drawer
Slide Rails:
Insert the drawer side rail
'
s
back end
(
h
)
into the
holder (
g
)
previously installed
(Step 4)
on the back panel
(
D
) (Figure
8
)
.
Then secure the drawer rail front
e
nd with 1/2”
screws
(e)
using the pre‐drilled
holes in the
face frame
(A)
.
The remainder of the screws can be used to secure the drawer to the rails.
7
.
Drawer Assembly (Figure
9
):
First
assemble the drawer front
(G)
with drawer box front
(H)
with
screws
(
f
)
.
T
hen assemble the rest parts of drawer box
(H)
using
your palm, or
a rubber
mallet if needed
, to secure the dove tails into position
.
f
Q
t
y
3-
5
a
Qty
8
Figure
9
D
F
B
Figure
8
Top
h
g
h
Qty
2
- 1 Set
e
Qty
8