![C.P.Bourg BB3001 Скачать руководство пользователя страница 13](http://html1.mh-extra.com/html/c-p-bourg/bb3001/bb3001_operators-manual_478752013.webp)
2.2 General
Binder description
1.
Main Switch
2.
Start up timer (optional)
(to skip the 35 minutes warm up)
3.
Handling loading area
4.
Control panel
5.
Thermostat
6.
Depth milling adjustment
7.
Depth milling indicator
8.
Cover station
9.
Glue tank access
10.
Output unit (optional)
Operator Manual
Page 9 - 13
Initial issue: 12/00
Latest revision: 11/01
EME
RGE
NCY
STO
P
NOT
STO
P
ARR
ET
D'U
RGE
NCE
NOO
DST
OP
GLU
E T
EMP
ERA
TUR
E C
ONT
ROL
LEI
MTE
MPE
RAT
URR
EGU
LIE
RUN
G
REG
ULA
TIO
N
TEM
PER
ATU
RE
CO
LLE
LIJM
TEM
PER
ATU
URS
TUR
ING
9
2
1
4
6
10
7
3
5
8
Содержание BB3001
Страница 41: ...7 APPENDIX National Coolbind 1300 Operator Manual Page 9 41 Initial issue 12 00 Latest revision 08 06...
Страница 42: ......
Страница 43: ......
Страница 44: ......
Страница 45: ......
Страница 46: ......
Страница 47: ......
Страница 49: ...Operator Manual Page 9 43 Initial issue 12 00 Latest revision 11 01 NOTES...
Страница 50: ...Operator Manual Page 9 44 Initial issue 12 00 Latest revision 11 01 NOTES...
Страница 51: ...Operator Manual Page 9 45 Initial issue 12 00 Latest revision 11 01 NOTES...