RETENTION PENSTOCK            

 

 

        

FL SERIES    

 

C.M.O.

 

       

Amategui

 

Aldea

 

142,

 

20400

 

Txarama

Tolosa

 

(SPAIN)

 

                

MAN

FL.ES00

 

 

Tel.

 

National:

 

902.40.80.50

 

Fax:

 

902.40.80.51

 

/

 

Tel.

 

International:

 

34.943.67.33.99

 

Fax:

 

34.943.67.24.40

 

[email protected]

 

 

 http://www.cmo.es

                                         

page 7

 

 

Once

 

the

 

penstock

 

has

 

been

 

installed,

 

check

 

that

 

all

 

bolts,

 

nuts

 

and

 

anchorings

 

have

 

been

 

correctly

 

tightened.

 

All

 

CMO

 

penstocks

 

are

 

tested

 

at

 

its

 

facilities,

 

although

 

the

 

penstock

 

may

 

have

 

become

 

damaged

 

during

 

transport

 

or

 

assembly.

 

Once

 

installed,

 

it

 

is

 

very

 

important

 

to

 

check

 

that

 

the

 

penstock

 

works

 

correctly,

 

making

 

sure

 

that

 

the

 

flap

 

swivels

 

on

 

its

 

turning

 

point

 

without

 

any

 

difficulty,

 

that

 

it

 

sits

 

perfectly

 

on

 

the

 

seal

 

when

 

the

 

penstock

 

is

 

closed,

 

etc.

 

 

If

 

the

 

penstock

 

has

 

electrical

 

accessories

 

or

 

you

 

are

 

in

 

an

 

ATEX

 

zone,

 

earth

 

connections

 

must

 

be

 

made

 

once

 

the

 

penstock

 

is

 

in

 

place

 

but

 

before

 

operating

 

it.

 

If

 

you

 

are

 

in

 

an

 

ATEX

 

zone,

 

check

 

the

 

continuity

 

between

 

the

 

different

 

elements

 

of

 

the

 

penstock

 

(EN

 

12266

2,

 

annex

 

B,

 

points

 

B.2.2.2.

 

and

 

B.2.3.1.).

 

Check

 

the

 

earth

 

connection

 

of

 

the

 

penstock.

 

 
 

 

These

 

FL

 

penstocks

 

do

 

not

 

have

 

an

 

actuator

 

system,

 

but

 

rather

 

are

 

automatic.

 

It

 

is

 

the

 

fluid

 

which

 

opens

 

or

 

closes

 

the

 

penstock.

 

When

 

the

 

fluid

 

comes

 

from

 

inside

 

the

 

pipe

 

to

 

the

 

outside,

 

it

 

pushes

 

on

 

the

 

flap

 

which

 

swivels

 

on

 

the

 

turning

 

point

 

and

 

opens

 

the

 

penstock.

 

The

 

degree

 

of

 

opening

 

will

 

be

 

proportional

 

to

 

the

 

pressure

 

of

 

the

 

fluid:

 

the

 

greater

 

the

 

pressure,

 

the

 

more

 

the

 

penstock

 

will

 

open

 

(fig.

 

9).

 

When

 

the

 

fluid

 

comes

 

from

 

the

 

extractor

 

towards

 

the

 

piping,

 

it

 

pushes

 

the

 

flap

 

against

 

the

 

body,

 

pressing

 

on

 

the

 

elastomer

 

seal

 

in

 

order

 

to

 

achieve

 

sealtight

 

integrity.

 

The

 

greater

 

the

 

fluid

 

pressure,

 

the

 

more

 

the

 

flap

 

presses

 

against

 

the

 

body,

 

thus

 

ensuring

 

sealtight

 

integrity

 

at

 

all

 

times

 

(fig.

 

10).

 

 
 

 

ACTUATOR

 

fig.

 

9

 

fig.

 

10

 

Gate

 

open

 

Gate

 

closed

 

Содержание FL Series

Страница 1: ...gui Aldea 142 20400 Txarama Tolosa SPAIN MAN FL ES00 Tel National 902 40 80 50 Fax 902 40 80 51 Tel International 34 943 67 33 99 Fax 34 943 67 24 40 cmo cmo es http www cmo es page 1 17 09 2014 INSTR...

Страница 2: ...d in the top part of the body using the holes fitted to secure the penstock and with the help of shackles If the equipment is packed in wooden boxes these must be provided with clearly marked holding...

Страница 3: ...coincides with the penstock boreholes standard If the penstock is to be wall mounted inspect the wall to ensure it is clean and flat ASPECTS TO BE CONSIDERED DURING ASSEMBLY When mounting the penstoc...

Страница 4: ...e flange in order to ensure there are no leakages to the outside where the flange and the penstock come together The seal to be installed will be selected in line with the working conditions inside th...

Страница 5: ...paste such as SIKAFLEX 11FC or similar in order to prevent leakages between the body and the wall Return the penstock to its location above the sealing paste and introduce the chemical or expansion a...

Страница 6: ...Once the equipment has been assembled make sure that there are no elements which can interfere with the flap movement The assembly of the equipment must be coordinated with the site s control and saf...

Страница 7: ...de once the penstock is in place but before operating it If you are in an ATEX zone check the continuity between the different elements of the penstock EN 12266 2 annex B points B 2 2 2 and B 2 3 1 Ch...

Страница 8: ...s will depend on the operating conditions of the penstock such as pressure temperature number of operations type of fluid and others These joints are bolted with flanges both the flanges and the bolts...

Страница 9: ...that it is correctly fitted and the seal 3 has not been damaged in the process 9 Remove the systems to secure the flap 2 in open position and carefully position it in closed position 10 Before startin...

Страница 10: ...ilation to prevent humidity The following aspects must be considered for storage purposes The storage place must be dry and under cover It is not recommended to store the equipment outdoors with direc...