![C-Aire S244B Скачать руководство пользователя страница 6](http://html1.mh-extra.com/html/c-aire/s244b/s244b_manual_3089021006.webp)
3
MOUNTING THE BASEPLATE COMPRESSOR
!
CAUTION
: Remove the compressor from the
shipping packaging before mounting�
FLOOR MOUNTING
Mark hole loca
�
ons
Place unit in chosen loca
�
on,
mark 2 holes and remove
unit.
Floor Mount kits are included
and include 2 anchor bolts, nuts, washers,
and vibration absorption washers.
2
Drill holes
Drill 1.75” deep using a 3/8” masonry drill
bit in the
fl
oor at indicated markings.
3
Install anchor bolts
Tap anchor bolts down to secure while
protec
�
ng bolt threads.
4
Secure Unit
Place unit on anchor bolts, slide on washer
and then loosely thread* nut over bolt.
* Do not
�
ghten nut. Tightening the nut may lead to
stress on the frame causing damage to the unit.
it.u
1
5
Install air
fi
lter assembly
INLET AND DISCHARGE PIPING
!
CAUTION
: Do not operate unit without inlet-air filtration�
If the air is dirty, pipe the filter to a source of clean air�
Do not install piping with a diameter lower than that of the pump intake�
!
CAUTION
: Do not use PVC plastic in the discharge line�
Use hand-welded or threaded steel or copper pipes and cast-iron fittings that are safe for the discharge pressure and temperature�
PORTABLE MODEL APPLICATION
The S244P is perfect for the temporary replacement of
decommissioned units in the field due to its portability,
durability, ease of installation, and all the added benefits
of a Digital AMD Gen-3� If the temporary application is for a
system that has a mechanical AMD, that AMD will need to
be put in “bypass”� Then quickly and easily set the pressure
setting on the Digital AMD based on the system’s regulator
settings�