16
9.6.
Start-up test
Name of customer:
Plant number:
Work-sheet number:
Type of plant:
Permeate flow [l/h]:
Concentrate flow [l/h]:
In case of problems, please fill in the problem report
Can the problem be related to the manufacturing?
Can the problem be related to the plant or the installation?
The plant - we mean only the part of the whole installation which was delivered by BWT (i.e only the plant).
The installation - we mean the piping etc. leading to the plant.
Can the problem be related to the sales department?
Description, please describe the problem
Signature
Name/initials of technician:
Date:
Time consumption for the start-up [hours]:
Problem report
The start-up test sheet must be completed and filed together with the operating journal.
RO plant
BWT PERMAQ Compact CRU
Status on start-up
Problems on start-up
Pressure switch start/stop, transport pump is OK
Drainage protection, overflow branch is connected to the drain
Pre-pressured hydrophore is OK
YES, there were problems at start-up
Start-up by dealer, specify dealer _____________________________________
YES, the problem can be related to the manufacturing
NO, the problem cannot be related to the manufacturing
NO, there were no problems at start-up
Start-up by BWT
YES, the problem only concerns the plant
YES, the problem only concerns the installation
YES, the problem concerns both the plant and the installation
NO, the problem does not concerns the plant or the installation
YES, the customer was misinformed
NO, the customer had been well-informed
Max. concentrate flow from RO to the CRU is < 500 [l/h]
Содержание PERMAQ Compact CRU
Страница 1: ...BWT PERMAQ Compact CRU Installation and Operating Manual UK www bwt group com ...
Страница 2: ...2 ...
Страница 12: ...12 9 2 P I Diagram BWT PERMAQ Compact CRU ...
Страница 13: ...13 9 3 Layout ...
Страница 14: ...14 9 4 Electrical connections ...
Страница 15: ...15 9 5 PCB circuit board ...