![BWT COVERDECK Скачать руководство пользователя страница 32](http://html1.mh-extra.com/html/bwt/coverdeck/coverdeck_installation-and-operating-instructions-manual_2836664032.webp)
Tools required
-
Set of Allen keys (no. 3, 4, 5, 6)
-
Wrench no. 10
-
Wrench no.13
-
Concrete drill bit Ø10mm
-
Measuring tape
-
Impact drill
-
Spindle disk grinder with diamond disk
-
Flat chisel and hammer
-
Mallet
Items delivered with the cover
-
End fixing plate, motor side (pre-assembled)
-
End fixing plate, bearing side
-
Stainless steel plate for attachment under the
coping (sub-coping mounting plate) (2)
-
Axle Ø190
-
Motor
-
Washer Z8 (x8)
-
Hex nut M8 (x8)
-
Carriage bolt (x8)
-
Hex collar nut (x4)
-
Countersunk flat socket head screw (CSFSH) M8
x 35 (x4)
-
Upat Express bushing (x8)
-
Conical spring washer (8)
-
Countersunk flat socket head screw (CSFSH) M8
x 20 (x8)
-
Pin Ø8 x75
-
Hex Socket Head Cap screw (HSHC) M6 x 25 (x4)
-
Spring washer Ø6 (x4)
-
Washer Z6 (x6)
-
Countersunk flat socket head screw (CSFSH) M6
x 15 (x2)
-
Nylstop nut M6 (x2)
-
Connecting box angle bracket
-
Countersunk flat socket head screw (CSFSH) M4
x 16 (x4)
-
Connecting box
-
Control panel
-
Key switch
Number of people required
Number of people necessary for installation:
-
Two people to carry and submerge the COVERDECK mechanism.
-
Once the COVERDECK mechanism has been submerged, one person to complete the installation.
Time for installation:
-
approximately 3 hours.
TABLE OF CONTENTS
INSTALLATION AND SAFETY RECOMMENDATIONS .......................................................PAGE 33
LAYOUT .................................................................................................................................PAGE 34
PREPARATION FOR INSTALLATION ..................................................................................PAGE 34
INFORMATION SUR LE NIVEAU DU BASSIN ....................................................................PAGE 35
ASSEMBLY PRIOR TO SUBMERSION ...............................................................................PAGE 36
SUBMERSION AND ATTACHMENT .....................................................................................PAGE 38
ELECTRICAL WIRING ..........................................................................................................PAGE 40
CONFIGURING THE ENDS OF TRAVEL .............................................................................PAGE 45
OPERATION AND ERROR MESSAGES .............................................................................PAGE 48
USE ....................................................................................................................................PAGE 49
MAINTENANCE AND WINTERING ......................................................................................PAGE 49
BEAM ASSEMBLY ................................................................................................................PAGE 50
CIVIL ENGINEERING ............................................................................................................PAGE 53
MAINTENANCE ....................................................................................................................PAGE 59
2019/01 - Indice de révision : N - Code : 34201
PROTECTION & SÉCURITÉ
32/60