Start-up – BWT AQUA Flex 200-1000
Note!
Check before start-up that all water and electrical connections are made as described in the
previous sections and that they are in compliance with local regulations.
For BWT AQUA Flex 200, 600 and 1000 with internal transport pump
The transport pump pressure switch and pressure tank are pre-set in our factory and do not need to
be adjusted.
1:
Switch the BWT AQUA Flex reservoir ON.
Note!
The transport pump cannot be started until the
reservoir tank of the plant has been completely filled up. Wait for the BWT AQUA Flex reservoir
tank to be completely filled.
2:
Check that the tank level automatically stops the plant when the BWT AQUA Flex reservoir is full.
NOTE:
Do not touch the level sensor.
3:
Create a large consumption of permeate and check that the transport pump starts automatically.
4:
Let the pump operate with a large flow for a 2 min. in order to get any residual air out of the pump
case.
5:
Check that the pump supplies water and pressure. If the pump does not supply water and pressure,
see chapter 6.2: Troubleshooting.
6:
When the transport pump is OK, close the consumption of permeate.
7:
Wait for the transport pump to stop automatically.
Note!
(On RO reservoir units): The transport
pump doesn’t stop until 10-30 sec. after the consumption has stopped due to the built-in time delay
in the control box.
8:
The BWT AQUA Flex reservoir unit has now been commissioned and is ready for use.
For BWT AQUA Flex T 200, 600 and 1000 with external transport pump
The transport pump now needs to be bled of air. This is done by filling in permeate through the
filling hole placed at the pump head.
1:
Remove the filling cap on the side of the pump and fill in permeate until it overflows (approx. 3-
4 litres).
2:
Put back the screw cap on the filling hole.
3:
Switch the BWT AQUA T Flex reservoir ON.
Note!
The transport pump cannot be started until
the reservoir tank of the plant has been completely filled up. Wait for the BWT AQUA Flex
reservoir tank to be completely filled.
4:
Check that the tank level automatically stops the plant when the BWT AQUA Flex reservoir is full.
NOTE:
Do not touch the level sensor.
5:
Create a large consumption of permeate and check that the transport pump starts automatically.
6:
Let the pump operate with a large flow for a 2 min. in order to get any air out of the pump case.
7:
Check whether the pump delivers water and pressure. If the pump do not provides water and
pressure, see Section 6.2 Troubleshooting.
8:
When the transport pump is OK, close the consumption of permeate.
9:
Wait for the transport pump stops automatically.
Note!
Transport pump stops first 10-30 sec.
after consumption has ceased because of the built-in time delay in the control box.
10:
The transport pump has now been bled and is ready for operation.
Содержание Aqua Flex T 1000
Страница 1: ...BW T Aqua Flex T 200 1000 Reservoir Installation and operating manual ...
Страница 17: ...EN 17 P I diagram without options ...
Страница 18: ...EN 18 P I diagram with options ...
Страница 19: ...EN 19 Layout drawing without Options ...
Страница 20: ...EN 20 Electrical connections ...
Страница 21: ...EN 21 ...
Страница 24: ...EN 24 Spare parts drawing without options ...
Страница 25: ...EN 25 Spare parts drawing with options ...