background image

16

THREE-PHASE CONNECTION

• Products should be installed only by authorized persons. 

• Installation of the product to be specified in the Project location to the 

wall or floor must be securely mounted. If mounted on the wall,it should 

mounted with bracket or with clamps. 

• Fan blades to be above 2,3 m from the floormust be installed. 

• Fan can not be installed out side the window or wall. 

• Open the gas pipeoro the fuel-burning devices inside of the room to 

avoid there flux of gas is necessary to take pre-measures.  

It is recommended that gloves be worn in the assembly of products. 

• The product must be connected to input and output channels. 

• Electrical cords definitely turn off the power before connecting. 

• When mounting brackets and mounts all the connections are made cor-

rectly to carry the weight of the product, make sure you have the strength. 

•  Even if the product off the main power supply is switched off when  

connecting equipments make sure that. 

•  Before mounting the electrical connection indicated on the product  

information (voltage, power, frequency, etc..) In the place of assembly 

are in keeping with that note. 

•  There is noob struction on the air flow way. 

•  Interms of safety ground terminal located on the terminal must be  

connected to earth certainly building. 

•  Motor thermal and overload relay make sure they are connected properly. 

•  If the thermal opens circuit during in any problems (while the product is not 

working) it must be reset from the system network and activated again. 

•  Product wiring, electrical connections must be as in the diagram. 

• Contact separation in all poles along with a switch that must be  

connected to fixed wiring installations in accordance with the rules. 

• If the product will be used in a dusty and oily working environment, it 

must be used with a filter. 

• Connection will be  

according to 

Scheme 2.3  for        

BST (Three-Phase)

Scheme 2.3 

BSM-BST_klavuz2021.qxp_Layout 1  9.02.2021  14:09  Page 19

Содержание BSM 250

Страница 1: ...BELGESi BVN markal r nler ISO 9001 2015 Kalite Y netim Sistemi belgesine sahip retim tesisinde retilmektedir 250 2K 250 300 350 400 450 500 550 600 BSM BST SANAY ASP RAT R BSM BST_klavuz2021 qxp_Layou...

Страница 2: ...Si GARANTi S RESi FAN BVN BSM BST 20 G N 2 YIL NVANI ADRESi TEL FAX FATURA TARiH VE NO FiRMA YETKiLiSiNiN iMZA VE KA ESi iMALAT I VEYA iTHALAT I FiRMA R N N SATICI FiRMA M TERiNiN BAH IVAN ELEKTR K MO...

Страница 3: ...m s ras nda eller eldivenle kesilmelere kar korunmal d r Fan al rken kesinlikle temas edilmemelidir Temizlik periyodik s relere uygun yap lmal aksi takdirde r n hasar g rebilir Fan ocuklardan uzak tut...

Страница 4: ...0 3800 62 B 44 230 50 60 185 1 17 0 95 6 1450 1700 4500 5275 65 B 44 230 50 60 200 190 1 1 0 9 6 1450 1700 5000 6000 71 B 44 230 50 60 230 1 1 8 1450 1700 5500 6450 72 B 44 230 50 60 220 320 1 07 1 64...

Страница 5: ...ihaz t m kutuplar n ay r c bir devre kesici d zenekle ba lay n 4 Hava y n ne uygun takt n zdan emin olun 5 Fana deneme al mas yap n z r nde titre im ve hata olup olmad n kontrol edin BSM 250 BSM 300 B...

Страница 6: ...ontaj elemanlar n n r n a rl n ta yabilecek mukavemete sahip oldu undan emin olunuz r n kapal olsa bile aparatlar ba larken ana g kayna n n kapal oldu undan emin olunuz Montaj ncesi r n n zerinde beli...

Страница 7: ...rmayacak ekilde kapat lmas n sa lay n z Hava k y n g vde zerinde etiket ile i aret edilen y nde olmal d r Hava ak m yolunda herhangi bir engel bulunmamal d r Kanatlar do ru y nde d nmelidir r n n al m...

Страница 8: ...niz Herhangi bir devrilmeye d meye kar ara i inde tamamen hareketsiz kalacak ekilde istiflenmeli A rl fazla olan r nlerin ta nmas s ras nda r n veya ta yan ah slar zarar g rmekten koruyacak uygun kald...

Страница 9: ...trol edilmeli ba lant lar g zden ge irilmeli ve hasar g rm veya eskimi kablo ve ekipmanlar de i tirilmelidir Periyodik bak m kullan m s kl na ba l olarak en az alt ayda bir veya daha s k yap lmal d r...

Страница 10: ...sisat r n n etiketinde yaz l gerilimden voltajdan farkl gerilimde kullanma nedenlerinden meydana gelecek hasar ve ar zalar 4 Yang n deprem ve y ld r m d mesi vb ile meydana gelecek hasar ve ar zalar 5...

Страница 11: ...isinde en az d rt defa veya imalat retici ve veya ithalat taraf ndan belirlenen garanti s resi i erisinde alt defa ar zalan mas n n yan s ra bu ar zalar n maldan yararlanamamay s rekli k lmas Tamiri i...

Страница 12: ...10 BSM BST_klavuz2021 qxp_Layout 1 9 02 2021 14 09 Page 13...

Страница 13: ...ts with BVN brand are manufactured in production facilities with ISO 9001 2015 Quality Management System certificate BSM BST 250 2K 250 300 350 400 450 500 550 600 AC INDUSTRIAL AXIAL FAN BSM BST_klav...

Страница 14: ...R PERIOD WARRANTY PERIOD FAN BVN BSM BST 20 WORK DAY 2 YEARS NAME ADDRESS PHONE FAX INVOICE DATE NUMBER DATE SIGNATURE SEAL MANUFACTURER S IMPORTER S PRODUCT S SELLER S M TERiNiN BAH IVAN ELEKTR K MOT...

Страница 15: ...hile operating Proper cleaning should be done with periodic intervals otherwise the product might be harmed Keep the fan away from children and do not let unauthorized people to use it Do not use do p...

Страница 16: ...1720 3250 3800 62 B 44 230 50 60 185 1 17 0 95 6 1450 1700 4500 5275 65 B 44 230 50 60 200 190 1 1 0 9 6 1450 1700 5000 6000 71 B 44 230 50 60 230 1 1 8 1450 1700 5500 6450 72 B 44 230 50 60 220 320...

Страница 17: ...aker connect the splitter 4 Be sure to install the product according to right air direction 5 Perfom a trial run for fan check whether vibration and error of the product CONNECTION SINGLE PHASE CONNEC...

Страница 18: ...e product off the main power supply is switched off when connecting equipments make sure that Before mounting the electrical connection indicated on the product information voltage power frequency etc...

Страница 19: ...ric connection box are closed correctly and do not admit water leakage Air exit direction should be in the direction indicated with the label on the body There shall not be any obstacles in the air fl...

Страница 20: ...o you The products should be stocked into the vehicle in a way to stay motionless in case of any turn over or fall down While heavy products are being carried use appropriate lifters to protect produc...

Страница 21: ...ections should be checked and damaged or worn out cables and equipment should be replaced Periodic maintenance should be carried out at least once every six months or more frequently depending on its...

Страница 22: ...defects arising due to low or high voltage faulty electrical installation and using the product at a different voltage than the one written on its label 4 Damages and defects due to fire earthquake l...

Страница 23: ...rmanently dysfunctions due to repeating of the same defect for more than twice or more than twice or more than four different times within the warranty period In case the maximum period for repairing...

Страница 24: ...www bvnair com T 90 212 771 48 48 F 90 212 771 48 42 info bvnair com BSM BST_klavuz2021 qxp_Layout 1 9 02 2021 14 09 Page 1...

Отзывы: