F-100 Super Sabre
Assembly & Operation Manual
BVM ® 2021
4
07/2021
UNPACKING
Carefully remove items from the box. Open each package and inspect for shipping
damage. After reading this entire manual, get familiar with the major kit components.
NOTE:
Damaged parts must be reported to BVM within 7 days of receiving your kit.
Become familiar with the work completed at the factory. It is important that you inspect and
approve this work now.
Using a stand, such as the BVM
General Purpose Jet Foam Cradle
(PA-SR-0080) will aid in the
assembly of the Bandit Evo.
Carbon Dowel Preparation
Use BVM Dry Lube (BVM# 1947) on
the Carbon Rods to allow easier
installation into the wing receptacles.