Cleaning
, maintenance and repairs
V-COMFORT Bedding
83
1.2
Maintenance schedule
– overview
Carry out maintenance work when the first interval is reached.
The times, continuous services or maintenance intervals of any third party
documentation are given priority.
Component/location
Activity
Interval
Entire machine
General visual inspection and function
check
Daily
Entire machine
Check if bolt joints are firmly seated
and retighten if necessary.
Monthly
Entire hydraulic system
Visual inspection
Prior to each start-up.
Entire hydraulic system
Check if all hoses, screw couplings
and components are tight and
retighten the screw couplings if
necessary.
After the first 10 hours of operation.
Every 50 operating hours thereafter.
Hydraulic hoses
Replace hoses.
Immediately if hoses are found to be
damaged.
Otherwise, every 6 years.
Hydraulic hoses
Remove chafe marks.
Prior to each start-up.
Chain drive of the dosing and mixing
augers
Check the tension of the roller chain
and retighten if necessary.
Monthly
Conveyor belt
Check tension and retighten if
necessary.
Prior to each start-up.
Conveyor belt
Check the belt connection of the
conveyor belt for obvious defects.
Weekly