
17
2009 T-121
Gearbox Disassembly Procedure
1. Remove 3/8” bolts from input cap. Remove the input cap taking care not to damage the seal
in the cap.
2. The input shaft assembly can now be removed. To disassemble the input shaft assembly it is
not necessary to remove the retaining ring. The bearing will press off of the ends of the
shaft and the gear will slide off.
3. The output gear will slide off of the output shaft.
4. Remove the 1/2” bolts from the output cap and remove the output cap; once again take care
not to damage the seal.
5. The output shaft assembly will have to be pressed out from the inside or it can be pulled out.
The bearings will need to be pressed off.
6. If any of the bearing races either in the housing or in the input cap need to be removed, a
blind hole bearing puller should be used.
Содержание T-121
Страница 1: ......
Страница 4: ...4 2009 T 121 Safety Section ...
Страница 12: ...12 2009 T 121 General Maintenance Tips ...
Страница 16: ...16 2009 T 121 Gearbox Disassembly and Assembly Procedures ...
Страница 19: ...19 2009 T 121 Partsbook ...
Страница 22: ...22 2009 T 121 3308 Gear Box See Maintenance Section for Recommended Lubrication ...
Страница 24: ...24 2009 T 121 3750 Transfer Box See Maintenance Section for Recommended Lubrication ...
Страница 26: ...26 2009 T 121 4082 Main Drive Shaft for Lift Type ...
Страница 39: ...39 2009 T 121 Optional Equipment and Other Items not Illustrated ...
Страница 44: ...44 2009 T 121 4085 Main Drive Shaft for Pull Type Standard ...
Страница 46: ...46 2009 T 121 4514 Constant Velocity Drive Shaft ...
Страница 48: ...48 2009 T 121 4133 Jackshaft for Pull Type ...
Страница 58: ......
Страница 59: ...59 2009 T 121 Notes ...
Страница 60: ......