OPERATION
1945 01/11
Operation Section 4-42
© 2011 Alamo Group Inc.
OPERA
T
ION
10.2 Hauling the Tractor and Implement
Before transporting a loaded tractor and implement,
measure the height and width dimensions and gross
weight of the complete loaded unit. Ensure that the
load will be in compliance with the legal limits set for
the areas that will be traveled through.
OPS-U- 0024
Use adequately sized and rated trailers and
equipment to transport the tractor and implement.
Consult an authorized dealer to determine the proper
equipment required. Using adequately sized chains,
heavy duty straps, cables and/or binders, securely tie
down both the front and rear of the tractor utilizing the
proper tie down locations as specified by the tractor
manufacturer.
OPS-U- 0025
Содержание 1945
Страница 5: ...Safety Section 1 1 SAFETY SECTION...
Страница 29: ...Introduction Section 2 1 INTRODUCTION SECTION...
Страница 34: ...INTRODUCTION 1945 01 11 Introduction Section 2 6 2011 Alamo Group Inc INTRODUCTION...
Страница 35: ......
Страница 36: ...INTRODUCTION 1945 01 11 Introduction Section 2 8 2011 Alamo Group Inc INTRODUCTION...
Страница 37: ...Assembly Section 3 1 ASSEMBLY AND CONNECTING THE LOADER SECTION...
Страница 47: ...Operation Section 4 1 OPERATION SECTION...
Страница 91: ...Maintenance Section 5 1 2011 Alamo Group Inc MAINTENANCE SECTION...
Страница 101: ...MAINTENANCE 1945 01 11 Maintenance Section 5 11 2011 Alamo Group Inc MAINTENANCE...
Страница 102: ...MAINTENANCE 1945 01 11 Maintenance Section 5 12 2011 Alamo Group Inc MAINTENANCE...
Страница 103: ......
Страница 106: ...1945 SOM 01 11 P N 50069161 Printed U S A 1945 LOADER...