7 | Commissioning
14 | 32
Instruction Manual R5 RB_RC 0021 C_EN_en
7
Commissioning
NOTICE
The machine can be shipped without oil.
Operation without oil will ruin the machine in short time!
●
Prior to commissioning, the machine must be filled with oil, see
CAUTION
During operation the surface of the machine may reach temperatures of more than 70°C.
Risk of burns!
●
Avoid contact with the machine during and directly after operation.
CAUTION
Noise of running machine.
Risk of damage to hearing!
If persons are present in the vicinity of a non noise insulated machine over extended periods:
●
Make sure that ear protection is being used.
●
Make sure that the installation conditions (see
9]) are met.
●
Switch on the machine.
●
Make sure that the maximum permissible number of starts does not exceed 30 starts per hour.
Those starts should be spread within the hour.
●
Make sure that the operating conditions comply with the
●
After a few minutes of operation, check the oil level and top up if necessary.
As soon as the machine is operated under normal operating conditions:
●
Measure the motor current and record it as reference for future maintenance and trouble-
shooting work.
7.1
Version with Oil Return Valve
When the machine runs, oil cannot flow back to the bottom oil receiver and it accumulates in the up-
per chamber of the oil separator.
After 2 hours of continuous operation near ultimate pressure, in case of operation in rough vacuum,
after a shorter time:
●
The machine must be shut down for at least 15 min.
➔
The oil can run down from the upper chamber of the oil separator into the bottom chamber