5 | Installation
8 / 28
Instruction Manual R5 RA 0155 A_EN_en
5
Installation
5.1 Installation Conditions
NOTICE
Use of the machine outside of the permitted installation conditions.
Risk of premature failure!
Loss of efficiency!
• Take care that the installation conditions are fully complied with.
~20 cm
~50 cm
~20 cm
~50 cm
• Make sure that the environment of the machine is not potentially explosive.
• Make sure that the ambient conditions comply with the
.
• Make sure that the environmental conditions comply with the protection class of the
motor and the electrical instruments.
• Make sure that the installation space or location is vented such that sufficient cooling
of the machine is provided.
• Make sure that cooling air inlets and outlets are not covered or obstructed and that
the cooling air flow is not affected adversely in any other way.
• Make sure that the oil sight glass (OSG) remains easily visible.
• Make sure that enough space remains for maintenance work.
• Make sure that the machine is placed or mounted horizontally, a maximum of 1° in
any direction is acceptable.
• Check the oil level, see
• Make sure that all provided covers, guards, hoods, etc. are mounted.
If the machine is installed at an altitude greater than 1000 meters above sea level:
• Contact your Busch representative, the motor should be derated or the ambient
temperature limited.
If the machine is equipped with monitoring devices or sensors:
• Make sure that the monitoring devices are correctly connected and integrated into
a control system such that operation of the machine will be inhibited if the safety
limit values are exceeded, see
Содержание R5 RA 0155 A
Страница 26: ...Note ...
Страница 27: ...Note ...