8
TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL
6. INSTALLATION OF THE HEATING
BOILER
The assembly, installation and
setup of boiler must be per
-
formed by a technician autho-
rized for such operations.
Installer must indicate to the
user of the installation the mini-
mum clearances from flamma-
ble materials and liquids.
6.1. Requirements:
- The ventilation area provided must
be in accordance with the requirements
of The Building Regulations Approved
Document J – Section 2: Appliances
burning solid fuel.
- For a boiler with a draught stabilizer,
a permanent air vent with a total free
area of at least 850mm2 per kW of
appliance rated output is required. To
achieve this, the following minimum
vent opening areas are required.
- The above clearances are as specified
in Building Regulations Approved
Document J. Also refer to Approved
Document J of either the England and
Wales or Irish building regulations
for further requirements on the
installation of flue systems for solid
fuel appliances.
Steps to assemble the panels of the
boiler housing
Step 1:
Fix the side panels 1 to Foundation
6 by using Rivet М8 х 16 mm – 2
pcs.
Step 2:
Fix the Back panel 2 to Foundation
6 by using Rivet М8 х 16 mm – 2
pcs. And fix the the Back panel 2
to Side panels 1 by using Screw
М5 x 16 mm – 2 pcs.
Step 3:
Fix Front lower panel 3 to side
panels 1 by using Screw М5 x 16
mm – 2 pcs.
Step 4:
Fix Front upper panel 4 to side
panels 1 by using Screw М5 x 16
mm – 2 pcs.
Step 5:
Mount thermometer 9 - place the
probe 10 into sensor sleeve 11
Step 6:
Fix the Cover panel 5 to side
panels 1 by using Screw М5 x 16
mm – 4 pcs.
* Necessary tool when assembling boiler
housing - screwdriver (screwdriver
with cross tip).
Make sure the boiler housing is assembled
stable.