SECTION II: PACKAGED BOILER ASSEMBLY - TRIM & CONTROLS
A.
REMOVE CRATE.
1. Remove all fasteners at crate skid.
2. Lift outside container and remove all other inside
protective spacers and bracing. Remove burner and
miscellaneous parts cartons.
B.
REMOVE BOILER FROM SKID.
1. To reduce the risk of damage to boiler jacket, use
the following procedure to remove from skid, see
Figure 3:
Step 1.
Boiler is secured to base with (4) 5/16" cap
screws, (2) in front and (2) in rear of shipping
skid, see Figure 3. Remove all securing
hardware.
Step 2.
Place wooden block(s) 12" from rear of
skid as shown (one piece 4" x 4" x 16" lg. or two
pieces of 2" x 4" x 16" lg.)
Step 3.
Insert 1" Sch. 40 pipe handles through leg
hole in front and rear legs. Center end of pipe on
wooden blocks as shown in Figure 3.
NOTE:
Pipe handles should extend a minimum
of 48" beyond jacket front panel for best
leverage.
Step 4.
Using the pipe handles, lift boiler until
adjustable legs are elevated above the deck
boards.
Step 5.
Remove skid from underneath the boiler.
Step 6.
Lower pipe handles until front adjustable
legs touch fl oor. If necessary, place wooden
blocks under front legs before lowering to
provide hand clearance.
Step 7.
To lower rear of boiler, tilt unit slightly
forward by pushing on smokebox collar or lift
pipes protruding through rear legs until wooden
blocks can be removed (see Figure 3). Slowly
allow the weight of the boiler to tilt backward
until rear legs rest on fl oor.
Step 8.
If wood block was placed under front legs,
lift pipe handles, remove wooden block and
lower front legs to fl oor. Remove pipe handles.
N
O
I
T
U
A
C
r
e
l
i
o
b
p
m
u
b
t
o
n
o
D
.
r
e
l
i
o
b
p
o
r
d
t
o
n
o
D
.
r
o
o
l
f
t
s
n
i
a
g
a
t
e
k
c
a
j
C.
MOVE BOILER TO PERMANENT POSITION
by sliding or walking.
D. PROCEDURE TO OPEN, CLOSE AND
SECURE BURNER SWING DOOR
Throughout this manual you will be instructed to open
and close the burner swing door for various reasons.
There is a proper and improper method to closing and
securing the burner swing door opened for inspection,
cleaning or fi eld service.
1.
TO OPEN BURNER SWING DOOR
(see Figures 4A and 4B).
Step 1.
Loosen but do not remove left side latching
hardware (3/8" x 1-3/4" lg. tap bolt).
Figure 3: Packaged Boiler Removal from Skid
Содержание MPO Series
Страница 6: ...6 Figure 1 MPO 84 Thru MPO 231 Water Boiler ...
Страница 12: ...12 Figure 4B Top View Burner Swing Door Mounted to Cast Iron Block Assembly Jacket Removed for Clarity ...
Страница 22: ...22 Figure 13A Water Boiler Piping for Circulator Zoned Heating System Supply Side Circulator ...
Страница 23: ...23 Figure 13B Preferred Water Boiler Piping for Zone Valve Zoned Heating System Supply Side Circulator ...
Страница 38: ...38 Figure 27 L1 L2 and V1 Head Electrode Positioning and Gun Setting Beckett AFG ...
Страница 49: ...49 SERVICE RECORD DATE SERVICE PERFORMED ...
Страница 50: ...50 Bare Boiler Assembly ...
Страница 52: ...52 Bare Boiler Assembly ...
Страница 54: ...54 Jacket Assembly ...
Страница 56: ...56 MPO84 Thru MPO231 Water Boilers Trim and Controls ...
Страница 58: ...58 Beckett AFG Burner ...
Страница 61: ...61 Figure A2 LWCO Location ...
Страница 62: ...62 SERVICE RECORD DATE SERVICE PERFORMED ...