background image

5

A.

  Intermittent Circulator Operation

1.

 

ROOM THERMOSTAT CLOSES

2.  CIRCULATOR MOTOR ENERGIZED

a.  As the thermostat closes its contacts, a low 

voltage circuit (24V.) is completed to the bimetal 
heater in the circulator relay (24A51).  After 
a time delay of 15 seconds, the main contacts 
(120V.) of the circulator relay close to start the 
circulator.

3.   HEATING  ELEMENT  #1  ENERGIZED 

a.  Simultaneous with the completing of the circuit 

for the circulator relay, two additional circuits 
are completed.  

b. The fi rst circuit is for the Heating Element 

Relays which pull in immediately and the 
second is for the bimetal heater in the #1 Heating 
Element Sequencer (24A54).  

c.  These two circuits will be energized only if the 

boiler is not “OFF” on limit.  

d.  After a time delay of 45 seconds (30 seconds 

after the circulator has started) the main and 
auxiliary contacts of the #1 Sequencer close; 
the main contacts (240V.) energizing heating 
element #1 and its pilot light (located at the 
bottom of the side panel), the auxiliary contacts 
(24V.) energizing the bimetal heater in the #2 
Heating Element Sequencer.

4.   HEATING  ELEMENT  #2  ENERGIZED 

a.  45 seconds after bimetal heater in #2 Heating 

Element Sequencer is energized, its main 
contacts (240V.) and auxiliary contacts close; 
the main contacts energizing heating element #2 
and its pilot light (3

rd

 lowest in the boiler), the 

auxiliary contacts (24V.) energizing the bimetal 
heater in the #3 Heating Element Sequencer.

5.   HEATING  ELEMENT  #3  ENERGIZED 

a.  45 seconds after bimetal heater in the #3 Heating 

Element Sequencer is energized, its main 
contacts and auxiliary contacts close; the main 
contacts (240V.) energizing heating element #3 
and its pilot light (2

nd

 lowest in the boiler), the 

auxiliary contacts (24V.) energizing the bimetal 
heater in the #4 Heating Element Sequencer.

6.   HEATING  ELEMENT  #4  ENERGIZED 

a.  45 seconds after bimetal heater in #4 Heating 

Element Sequencer is energized, its main 
contacts and auxiliary contacts close, the main 
contacts (240V.) energizing heating element #4 
and its pilot light (highest in the boiler) – nothing 
is connected to the auxiliary contacts.

SECTION II:  OPERATING AND SERVICE INSTRUCTIONS

7.  ROOM THERMOSTAT OPENS

8.  HEATING ELEMENTS DE-ENERGIZED

 

When the thermostat is satisfi ed and opens its 
contacts, the low voltage circuits to the Heating 
Element Relay and the Heating Element Sequencers 
are broken.  The Heating Element Relays “drop-out” 
immediately and totally de-energize the Heating 
Elements and pilot lights.  After a time delay of 45 
seconds, the main contacts of all the Sequencers 
“break” thus resetting the Heating Element Relays.

9.  CIRCULATOR MOTOR DE-ENERGIZED 

 

Simultaneous with the breaking of the low voltage 
circuit to the Heating Element Sequencers is the 
breaking of the low voltage circuit to the Circulator 
Relay by the opening of the thermostat contact.  
After a time delay of 90 seconds after all Heating 
Elements are “off” the bimetal heater opens the 
main contacts in the Circulator Relay thus stopping 
the circulator.  When the boiler is zoned with 
circulator and switching relays as illustrated in 
Figure 6 on Page 8 the circulator switch must be in 
the “constant” position; therefore the circulator will 
not have any delay when the thermostat(s) closes or 
opens its contacts.

B.

  Continuous Circulator Operation

 

If the Circulator Switch (located in the control portion 
of the Boiler Jacket) is placed in the “CONT.” position, 
the Circulator will run continuously and the Heating 
Elements will sequence as in steps 3-6 and 8 above.

C.

  Dual Limit Operation

 

The Dual Limit Control consists of two independently 
adjustable temperature limits.  The left hand adjustment 
is for the safety limit and should be set initially for 
220°F.  The lower right hand adjustment is for the 
operating limit and should be set for 210°F with a 
differential setting (upper right hand adjustment) of 10º.  
These adjustments may be varied to suit the individual 
installation, with minimum of 10° difference between 
the limit settings.  If the setting of the operating Limit 
or the safety limit is reached, the Heating Elements only 
will be de-energized; the Circulator will continue to 
run.  If the Circulator Switch is in the “INT.” position, 
the Circulator runs until the thermostat is satisfi ed and 
the main contacts on the Circulator Relay open.

G

N

I

N

R

A

W

s

i

r

e

l

i

o

b

e

h

t

f

o

n

o

i

t

a

l

l

a

t

s

n

i

e

r

o

f

e

B

e

h

t

f

o

n

o

i

t

a

r

e

p

o

e

h

t

,

e

t

e

l

p

m

o

c

d

e

r

e

d

i

s

n

o

c

,

d

e

k

c

e

h

c

e

b

d

l

u

o

h

s

s

l

o

r

t

n

o

c

r

e

l

i

o

b

t

i

m

i

L

y

t

e

f

a

S

&

g

n

i

t

a

r

e

p

O

e

h

t

y

l

r

a

l

u

c

i

t

r

a

p

.

s

l

o

r

t

n

o

C

Содержание E4

Страница 1: ... a i r e S d n a r e b m u N l e d o M r e l i o B e d i v o r p r e l i o b r e b m u N l e d o M r e l i o B r e b m u N l a i r e S r e l i o B e t a D n o i t a l l a t s n I _ _ _ _ _ _ _ 4 E _ _ _ _ _ _ _ 6 r o t c a r t n o C g n i t a e H r e b m u N e n o h P s s e r d d A D N A G N I T A R E P O N O I T A L L A T S N I R O F S N O I T C U R T S N I E C I V R E S E E R F E R A C R E L I O...

Страница 2: ... 6 8 5 2 5 e h t f o s i s a b e h t n o d e t c e l e s e b y a m r e l i o b e h t e c a p s d e t a e h e h t n i e r a g n i p i p d n a r e l i o b e h t e r e h W n w o h s e r a s e i t i c a p a C g n i t a e H E O D g n i t a e h l a t o t e h t e n i m r e t e d o t s s o l g n i d l i u b e h t o t s s o l s i h t d d a t s i x e l l i w s s o l p u k c i p a r o d n a s s o l g n i p i...

Страница 3: ...epending upon wall construction passing through the holes provided in the wall mounting channels Figure 1 shows bolt center dimensions It is recommended that 1 2 plywood be used as a base for mounting the boiler so that the structure is adequate to carry the weight imposed upon it see Figure 1 for weight of boiler when full of water Boiler should be level for proper operation of BUILT IN AIR SEPAR...

Страница 4: ...tor will be furnished G A Prewired Low Voltage Control System is furnished with every CARE FREE boiler 1 All controls are furnished in a compartment at the front of the boiler for easy accessibility In addition to the Transformer used to power the system are the following Circulator Relay Heating Element Sequencers one per Heating Element Dual High Limit Control Circulator Operation Selector Switc...

Страница 5: ... When the thermostat is satisfied and opens its contacts the low voltage circuits to the Heating Element Relay and the Heating Element Sequencers are broken The Heating Element Relays drop out immediately and totally de energize the Heating Elements and pilot lights After a time delay of 45 seconds the main contacts of all the Sequencers break thus resetting the Heating Element Relays 9 CIRCULATOR...

Страница 6: ...6 Figure 4 Wiring Diagram Model E 4 Boilers ...

Страница 7: ...ator light is on it indicates its respective heating element is energized If the light is off it indicates 1 The heating element has not been energized 2 The heating element sequencer is malfunctioning E Built In Air Eliminator An air eliminator has been built into the top of the electric boiler and a 3 4 tapping is provided with nipple and tee for connection of Relief Valve and a float type Air V...

Страница 8: ...n a 5 2 e v o b a e g r a h C e c i v r e S f o s a e c i r P l i a t e R 0 4 5 4 0 5 5 5 0 6 5 6 0 7 5 7 accordance with U S Boiler Co Inc recommendations and hydronics industry standards These warranties will be inapplicable if the residential grade water boiler is used or operated over its rated capacity is subjected to unauthorized modification or is damaged as a result of being otherwise impr...

Отзывы: