
9
→
Place the solenoid on it and fasten the nut, observing the
maximum tightening torque of 2.8 Nm.
Nut
Solenoid
Fastening screw
Seal
Manifold
Fig. 3:
Installing the devices with a flange connection
5.2
Electrical installation
Warning
Risk of injury due to electric shock.
▶
Before working on the system or device, switch off the power
supply and secure against reactivation.
▶
Observe the applicable accident prevention regulations and
safety regulations for electrical devices.
Risk of electric shock if protective conductor not connected.
▶
Always connect protective conductor.
▶
Check electrical continuity between solenoid and housing.
→
Connect the protective conductor.
→
Attach seal and check that it fits properly.
→
Screw on the cable plug (see data sheet for approved types),
observing the maximum tightening torque of 0.3 Nm.
→
Check electrical passage.
English