
39
Maintenance, cleaning
install the actuator (with control unit) on the valve body
→
Check the graphite seal and if required, replace it.
Warning!
danger if incorrect lubricants used!
Unsuitable lubricant may contaminate the medium. In oxygen
applications there is a risk of an explosion!
▶
In specific applications, e.g. oxygen or analysis applications, use
appropriately authorised lubricants only.
→
Grease nipple thread before re-installing the actuator (e.g. with
Klüber paste UH1 96-402 from Klüber).
note!
damage to the seat seal or the seat contour!
▶
When installing the actuator, ensure that the valve is in open
position.
→
control function a
:
Without unit control:
pressurize the pilot air port 1 with com-
pressed air (5 bar): valve opens.
With unit control:
open the valve according to the operating
instructions for the control unit.
→
Screw actuator into the valve body.
Observe tightening torque (see “Tab. 20”).
1
2
Pilot air port
Fig. 36: Connections
tightening torques of valve body / nipples
dn
tightening torques [nm]
15
45 ±3
20
50 ±3
25
60 ±3
32
65 ±3
40
50
70 ±3
65
100 ±3
Tab. 20: Tightening torques of valve body / nipples
If the position of the pilot air ports for installation of the hoses
is unfavorable, these can be aligned steplessly by rotating
the actuator through 360°.
The procedure is described in the chapter entitled “8.3.4
Rotating the actuator”.
english
Type 2300
Содержание 2300 Series
Страница 44: ...44 english Type 2300 ...
Страница 86: ...86 Typ 2300 deutsch ...
Страница 128: ...128 Type 2300 français ...
Страница 129: ......
Страница 130: ...www burkert com ...