background image

2190 Dagenais Blvd. West

Tel.: 514.337.4415

Laval (Quebec)

Fax: 514.337.4029

Canada
H7L 5X9                                     [email protected]

INSTALLATION

INSTRUCTIONS

Please read these

instructions

carefully. 

Failure

to comply to

instructions and

designed

operation of 
this system,

may 

void

the

warranty.

©

2012  BUR-CAM  Printed in Canada   450373TW

Your pump has been carefully packaged at the factory to 
prevent damage during shipping. However, occasional damage
may occur due to rough handling. 

Carefully inspect your pump

for damages that could cause failures. Report any damage to
your carrier or your point of purchase.

MODEL

400505TW

SEWAGE

PUMPS

W W W. B U R C A M . C O M

INITIAL START UP PROCEDURES:

1.

Inspect the pump and the sewage tank for 

any obvious condition that may 

necessitates cleaning, correction, 

adjustement or repair.

2.

Assure that the pump is secure and 

vertical for proper operation.

3.

Assure that there is adequate clearance 

from any combustible materials or 

structure. Stored materials must be kept 

away from the pump. Shelves or cabinet 

structures must not be in close proximity 

over the pump.

4.

Assure that the motor is securely plugged 

into a proper ‘GFCI’ electrical outlet.

5.

Test the ‘GFCI’ outlet by pressing its test 

switch. This should prove that the outlet is 

energized and will trip off to protect against

a ground fault. Be sure to reset the ‘GFCI’

by pressing its reset switch. 

(Repeat this step monthly)

6.

Lift the float to assure that the pump will 

start when required. (Step 7 below will test 

submersible pumps with enclosed floats).

7.

Pour pails of water in the sewage tank to 

turn the pump on. Assure that any check 

valve present will permit the sewage to flow.

8.

Observe that the plumbing can pump the 

sewage safely out of the residence. 

(Repeat this step monthly)

Отзывы: