background image

www.burcam.com

INSTALLATION 

INSTRUCTIONS

Please read these 

instructions carefully. 

Failure

 to comply to 

instructions 

and 

designed

 operation of 

this system,

 may 

void

 the warranty.

Your pump has been carefully packaged at the 

factory to prevent damage during shipping. 

However, occasional damage may occur due to 

rough handling.

 Carefully inspect your pump 

for damages that could cause failures. Report any 

damage to your carrier or your point of purchase.

MODEL

300735

SUMP PUMP

MONTHLY MANDATORY CHECK-UP:

1. Inspect the pump and the sump for any  

  obvious condition that necessitates  

  cleaning, correction,adjustement or repair.
2. Clear the sump and the surroundings of  

  any paper, leaves or other debris that    

  might clog the input openings. Remove  

  anything that might float into the sump.

3. Assure that the pump is secure and   

  vertical for proper operation.
4. Assure that there is adequate clearance  

  from any combustible materials or  

 

  structure. Stored materials must be kept  

  away from the pump. Shelves or cabinet 

  structures must not be in close proximity  

  over the pump.
5. Assure that the motor is securely plugged  

  into a proper ‘GFCI’ electrical outlet.
6. Test the ‘GFCI’ outlet by pressing its test  

  switch. This should prove that the outlet is 

  energized and will trip off to protect against  

  a ground fault. Be sure to reset the ‘GFCI’  

  by pressing its reset switch.

7. Lift the float to prove that the pump will  

  start when required. (Step 8 below will test  

  submersible pumps with enclosed floats).
8. Put a pail of water (8 liters) in the sump to  

  prove that any check valve present will  

  permit effluent to flow.

9. Observe that the plumbing can carry the  

  effluent safely out of the residence.

 

2190 boul. Dagenais West 

TEL: 514.337.4415

 LAVAL (QUEBEC) 

FAX: 514.337.4029

 CANADA

 H7L 5X9                             

         [email protected]

©    201

1    BUR-CAM    Printed in Canada    310204

Содержание 300735

Страница 1: ...s secure and vertical for proper operation 4 Assure that there is adequate clearance from any combustible materials or structure Stored materials must be kept away from the pump Shelves or cabinet str...

Страница 2: ...uming that you have a sump pit located in your basement floor Your sump pit must be constructed from concrete brick tile or more recently a sump basin made from plastic and or fiberglass The minimum s...

Страница 3: ...en pit is ready proceed to next step STEP 1 STEP 2 Application This submersible sump pump is designed for a permanent sump installation It can be used in light commercial application and is great for...

Страница 4: ...n extension cord to connect your pump to the power source From your distribution panel to the receptacle we recommend a wire gauge not smaller than 14 gauge Use tape or tie wrap to fix power cords to...

Страница 5: ...pipe STEP 6 Connect float and motor power cable STEP 7 Fill the basin and test the operation STEP 8 Review and check connections for leaks SUMP PUMP APPLICATION REPAIR PARTS STEP 2 Sump pit 18 diamete...

Страница 6: ...r Improper float position Check movement Pump does not Jammed impeller Clean deliver to full Plugged check valve Clean replace capacity Blocked suction inlet Check for debris in pit and clean Discharg...

Страница 7: ...ion verticale pour un fonctionnement ad quat 4 Assurez vous que tout mat riel ou structure combustible est suffisamment loign de la pompe Tout mat riel entrepos doit tre tenu l cart de la pompe Les st...

Страница 8: ...limentation de la prise Assumant que vous avez une fosse dans votre sous sol Votre fosse doit tre construite de b ton briques tuiles ou bassin de plastique et ou de fibre de verre La dimension minimal...

Страница 9: ...lation permanente Elle peut tre utilis e pour une application commerciale l g re Elle est tr s efficace pour ass cher les endroits inond s Capacit 5 4000 GPH US 10 3300 GPH US 15 2650 GPH US 20 1580 G...

Страница 10: ...ique la prise nous recommandons un calibre minimal de 14 Utiliser du ruban gomm ou des attaches pour c bles et fixer les c bles lectriques au tuyau de d charge Emplir la fosse ou le bassin avec de l e...

Страница 11: ...s c bles d alimentation de la flotte et de la pompe TAPE 7 Emplir le bassin et v rifier le fonctionnement TAPE 8 R vis et v rifier les joints APPLICATION DE POMPE PUISARD PI CES DE RECHANGE TAPE 2 Bas...

Страница 12: ...eux Remplacer Flotte bloqu e V rifier le mouvement Le d bit n est Impulseur bloqu Nettoyer pas pleine Clapet de retenue bloqu Nettoyer remplacer capacit Succion bloqu e V rifier les d bris et nettoyer...

Отзывы: