Содержание WM12
Страница 3: ...3 PART LIST CBL1 TENSION CABLE FM2 FM3 FM4 FM5 FLOOR MOUNT FIXTURE FM6 1 2 3 4 5 6 BRACKET...
Страница 4: ...SUGGESTED DIMENSIONS ONLY 4...
Страница 8: ...8 3 Push cables through holes on top of bracket CABLE 90 Inches...
Страница 9: ...9 4 Add plumb line to cable as shown or use a laser leveler to mark spots for drilling anchor holes...
Страница 10: ...10 5 Drill holes in floor as shown below...
Страница 11: ...6 Mount floor fixture FM1 into floor as shown below 11...
Страница 13: ...8 13 Add all Wooden Rods to cables as shown...
Страница 16: ...16 11 Tighten FM2 to FM1 as shown below This will add tension to the cable and stabilize the fixture...
Страница 18: ...18 13 Use a leveler tool to ensure wooden rods are horizantal ly levelled Adjust WR3 if needed...
Страница 19: ...14 19 Buoyant Cable Wine System section ENJOY...