4
Initial Set Up Guide
1. Slide empty funnel into funnel guides
as shown.
2. Fill decanter with cold water. Swivel
brewer lid and pour water into brewer.
Position decanter on base below
funnel. Close the lid and wait
three
minutes while the internal tank
partially fills.
3. Open the lid. Remove decanter and
fill with cold water
again. Pour water
into brewer. Position decanter on base
under funnel and close the lid.
4. Wait until water flows from the funnel.
When water flow stops, pour out
any water that has collected in the
decanter. Replace decanter on brewer
below the funnel.
5. Now, plug in the brewer.
6. Press the vacation switch, located
on the side
(NHBX)
or the back
(STX)
of the brewer, to turn unit
on (Press
I to turn on and press O
to turn off.) Wait 15 minutes for the
water in the tank to heat.
See steps on page 5 for brewing perfect coffee.
NHBX
STX
IMPORTANT:
Brewer is NOT ready to plug in until you have followed
the steps below. Do NOT plug in brewer until step #5.