Bunn FPG-2 DBC Скачать руководство пользователя страница 3

3

USER NOTICES

Carefully read and follow all notices on the grinder and in this manual.  They were written for your protection.

All notices on the grinder are to be kept in good condition.  Replace any unreadable or damaged labels.

Replacement part

#20545.0000

Replacement part

#05876.0000

36705  031504

ELECTRICAL REQUIREMENTS

This grinder has an attached cordset and requires 2-wire, grounded service rated 120 volts ac, 15 amp,

single phase, 60 Hz.

OPERATING CONTROLS

Grind Pad (a)

Pressing 

 initiates a timed grind cycle.

Stop Pad (b)

Pressing 

 ends the operation of the grinder.

® PAD (c)

Pressing the ® pad allows programming access

(see page 5).

Hopper/Batch Selector Pads (d)

These pads are located on the funnel depictions on each side of the grinder with a total of 6 pads.  Selecting

one of these pads will select the amount of grind and side from which to grind.

Example:  Selecting the lower pad on the left side will grind enough beans from the left side of the grinder to

brew the amount programmed into grinder.

Control Board

The control board determines the amount of beans that will leave the hopper in a grind cycle. The timer

portion can be adjusted to dispense a different amount from each hopper and each batch size. The scale is from
0.4 to 99.9 seconds.  Refer to the Adjustments section for timer setting chart (page 5).

GRINDER  DBC

®

d

d

c

b

a

Отзывы: